Future stations: Difference between revisions
(Add in remaining Northumberland stations basic details (CRS+name)) |
(add Wixams; add CR for Winslow) |
||
(23 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
This page lists '''future stations''' on Britain's railway or tramway networks. Stations are only listed here once work has begun or there is a realistic prospect of the station being completed, rather than those that are simply listed as part of the [[Restoring Your Railway]] campaign, for instance. Speculative stations should not be added. | |||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
! Station | ! Station | ||
Line 6: | Line 8: | ||
! Location | ! Location | ||
! Notes | ! Notes | ||
|- | |- | ||
| [[White Rose]] | | [[White Rose]] | ||
| WRO | | WRO | ||
| | | 2024<ref>https://www.yorkshireeveningpost.co.uk/news/transport/white-rose-station-link-bridges-installed-at-new-ps265-million-leeds-rail-station-as-construction-continues-4363215</ref> | ||
| [[Northern]] | | [[Northern]] | ||
| Between [[Cottingley]] and [[Morley]] | | Between [[Cottingley]] and [[Morley]] | ||
| Replaces Cottingley | | Replaces Cottingley | ||
|- | |- | ||
| [[Golds Hill]] | | [[Golds Hill]] | ||
| rowspan=9 | N/A | | rowspan=9 | N/A | ||
| rowspan=9 | | | rowspan=9 | 2024<ref>https://metroalliance.co.uk/projects/wednesbury-to-brierley-hill-extension/</ref> | ||
| rowspan=9 | [[West Midlands Metro]] | | rowspan=9 | [[West Midlands Metro]] | ||
| rowspan=9 | New spur from [[Wednesbury]] | | rowspan=9 | New spur from [[Wednesbury]] | ||
Line 93: | Line 38: | ||
|- | |- | ||
| [[Dudley Town Centre]] | | [[Dudley Town Centre]] | ||
|- | |- | ||
| [[Ashington]] | | [[Ashington]] | ||
| ASL | | ASL | ||
| 2024<ref>https://railuk.com/rail-news/new-depot-for-northern-conductors-to-be-built-in-ashington/</ref> | |||
| rowspan=6 | [[Northern]] | | rowspan=6 | [[Northern]] | ||
| rowspan=6 | Branch off [[East Coast Main Line]] | | rowspan=6 | Branch off [[East Coast Main Line]] | ||
Line 130: | Line 48: | ||
| [[Bedlington]] | | [[Bedlington]] | ||
| BEJ | | BEJ | ||
| rowspan=5 | 2024<ref name="northumberland">https://www.northumberlandline.uk/post/northumberland-line-newsletter-december-2022</ref> | |||
|- | |- | ||
| [[Blyth Bebside]] | | [[Blyth Bebside]] | ||
Line 140: | Line 59: | ||
| SEJ | | SEJ | ||
|- | |- | ||
| [[Northumberland Park ( | | [[Northumberland Park (Tyne & Wear)]] | ||
| NOP | | NOP | ||
|- | |||
| [[Pineapple Road]] | |||
| PIR | |||
| rowspan=3 | by December 2024<ref name="chl">https://www.bbc.co.uk/news/uk-england-birmingham-66037299</ref> | |||
| rowspan=3 | [[West Midlands Railway]] | |||
| rowspan=3 | Birmingham [[Camp Hill line]] (between [[Birmingham New Street]] and [[Kings Norton]]. | |||
| rowspan=3 | | |||
|- | |||
| [[Kings Heath]] | |||
| KIH | |||
|- | |||
| [[Moseley Village]] | |||
| MOV | |||
|- | |- | ||
| [[Winslow]] | | [[Winslow]] | ||
| | | WNO | ||
| by 2025<ref>https://eastwestrail.co.uk/the-project/bicester-to-bletchley</ref> | | by 2025<ref>https://eastwestrail.co.uk/the-project/bicester-to-bletchley</ref> | ||
| | | [[Chiltern Railways]] | ||
| Between [[Bicester Village]] and [[Bletchley]] | | Between [[Bicester Village]] and [[Bletchley]] | ||
| Part of [[East West Rail]] | | Part of [[East West Rail]] | ||
|- | |||
| [[Crwys Road]] | |||
| | |||
| 2025<ref name="cardiff">https://cardiffjournalism.co.uk/thecardiffian/2024/03/08/delays-to-arrival-of-new-cardiff-train-stations-due-to-open-this-year-with-one-cancellation/</ref> | |||
| rowspan=2 | [[Transport for Wales]] | |||
| Between [[Cardiff Queen Street]] and [[Heath High Level]] | |||
| rowspan=2 | Part of [[South Wales Metro]] | |||
|- | |||
| [[Butetown]] | |||
| | |||
| 2025<ref name="cardiff" /> | |||
| Between [[Cardiff Bay]] and [[Cardiff Queen Street]], formerly known as [[Loudoun Road]] | |||
|- | |||
| [[Willenhall]] | |||
| WIA | |||
| rowspan=2 | Originally early 2024<ref>https://www.birminghammail.co.uk/black-country/uncertainty-over-new-railway-stations-27540706</ref>, now late 2025<ref>https://www.newcivilengineer.com/latest/willenhall-and-darlaston-stations-heading-30m-over-budget-as-opening-slips-to-late-2025-15-11-2023/</ref> | |||
| rowspan=2 | [[West Midlands Railway]] | |||
| rowspan=2 | Between [[Walsall]] and [[Woverhampton]] | |||
| rowspan=2 | | |||
|- | |||
| [[Darlaston]] | |||
| DAS | |||
|- | |- | ||
| [[Albert Street]] | | [[Albert Street]] | ||
Line 162: | Line 116: | ||
|- | |- | ||
| [[High Street, Deritend]] | | [[High Street, Deritend]] | ||
|- | |||
| [[Magna Park & Ride]]<ref>https://www.bbc.co.uk/news/uk-england-south-yorkshire-68556755</ref> | |||
| | |||
| | |||
| [[Sheffield Supertram]] | |||
| Between [[Meadowhall South/Tinsley]] and [[Rotherham Central]] | |||
| Served by [[tram-train]] only | |||
|- | |||
| [[Wixams]] | |||
| | |||
| 2026 | |||
| [[Thameslink]] | |||
| Between [[Flitwick]] and [[Bedford]] | |||
|- | |- | ||
| [[Liverpool Baltic]] | | [[Liverpool Baltic]] | ||
| | | LVB | ||
| c. 2027 | | c. 2027 | ||
| [[Merseyrail]] | | [[Merseyrail]] | ||
Line 181: | Line 148: | ||
| [[Old Oak Common]] | | [[Old Oak Common]] | ||
|} | |} | ||
==Postponed schemes== | ==Postponed schemes== | ||
The following stations and stops previously appeared in the above list, but have become less certain due to a change in circumstances. | The following stations and stops previously appeared in the above list, but have become less certain due to a change in circumstances. | ||
Line 196: | Line 164: | ||
| rowspan=8 | [[West Midlands Metro]] | | rowspan=8 | [[West Midlands Metro]] | ||
| rowspan=8 | New spur from [[Wednesbury]] | | rowspan=8 | New spur from [[Wednesbury]] | ||
| rowspan=8 | Part of the Wednesbury-Brierley Hill extension. Phase 2 of this extension, from Dudley to Brierley Hill, is currently paused due to funding constraints. | | rowspan=8 | Part of the Wednesbury-Brierley Hill extension. Phase 2 of this extension, from Dudley to Brierley Hill, is currently paused due to funding constraints. | ||
|- | |- | ||
| [[New Road]] | | [[New Road]] | ||
Line 312: | Line 280: | ||
| Between [[Exeter St. Thomas]] and [[Starcross]] | | Between [[Exeter St. Thomas]] and [[Starcross]] | ||
| | | | ||
|- | |||
| [[Thanet Parkway]] | |||
| THP | |||
| 31 July 2023<ref> https://theisleofthanetnews.com/2023/04/14/thanet-parkway-station-opening-date-moved-from-may-to-july/</ref> | |||
| [[Southeastern]] | |||
| Between [[Canterbury West]] and [[Margate]] | |||
| | |||
|- | |||
| [[Portway Park & Ride]] | |||
| PRI | |||
| 1 August 2023<ref>https://twitter.com/gwrhelp/status/1684220309610668034</ref> | |||
| [[Great Western Railway]] | |||
| Between [[Shirehampton]] and [[Avonmouth]] | |||
| | |||
|- | |||
| [[Piper's Row]] | |||
| rowspan=2 | N/A | |||
| rowspan=2 | 17 September<ref>https://www.railmagazine.com/news/network/2023/10/04/metro-extension-opens-after-three-year-delay</ref> | |||
| rowspan=2 | [[West Midlands Metro]] | |||
| rowspan=2 | Wolverhampton | |||
| rowspan=2 | Wolverhampton City Centre loop extension | |||
|- | |||
| [[Wolverhampton]] | |||
|- | |||
| [[Headbolt Lane]] | |||
| HBL | |||
| 5 October 2023<ref>https://www.bbc.co.uk/news/uk-england-merseyside-67011369</ref> | |||
| [[Merseyrail]] | |||
| Between [[Kirkby]] and [[Rainford]] | |||
| | |||
|- | |||
| [[Brent Cross West]] | |||
| BCZ | |||
| 10 December 2023<ref>https://www.bbc.co.uk/news/uk-england-london-67679149</ref> | |||
| [[Thameslink]] | |||
| Between [[Cricklewood]] and [[Hendon]] | |||
| | |||
|- | |||
| [[East Linton]] | |||
| ELT | |||
| 13 December 2023 | |||
| [[ScotRail]] | |||
| Between [[Dunbar]] and [[Drem]] | |||
| | |||
|- | |||
| [[Cameron Bridge]] | |||
| CBX | |||
| rowspan=2 | 2 June 2024<ref>https://www.thenational.scot/news/24353197.historic-john-swinney-opens-levenmouth-rail-link/</ref> | |||
| rowspan=2 | [[ScotRail]] | |||
| rowspan=2 | Spur off [[Fife Circle]] | |||
| rowspan=2 | [[Levenmouth rail link]] | |||
|- | |||
| [[Leven]] | |||
| LEV | |||
|- | |||
| [[North Station]] | |||
| rowspan=2 | N/A | |||
| rowspan=2 | 16 June 2024<ref>Charley's Mk. 1 eyeball</ref> | |||
| rowspan=2 | [[Blackpool tramway]] | |||
| rowspan=2 | New spur to [[Blackpool North]] from [[Talbot Square]] | |||
| rowspan=2 | | |||
|- | |||
| [[Talbot Square]] | |||
|- | |||
| [[Ashley Down]] | |||
| ASD | |||
| 28 September 2024<ref>https://www.bbc.co.uk/news/uk-england-bristol-64861060</ref> | |||
| [[Great Western Railway]] | |||
| Between [[Filton Abbey Wood]] and [[Stapleton Road]] | |||
| | |||
|- | |||
| [[Belfast Grand Central]] | |||
| | |||
| 13 October 2024<ref>https://www.bbc.co.uk/news/articles/cp39pp0yepwo</ref> | |||
| [[Translink]] | |||
| Replaces [[Belfast Great Victoria Street]] | |||
| | |||
|} | |} | ||
==References== | ==References== | ||
<references /> | <references /> | ||
[[Category:Future mainline stations]] [[Category:Future tram stops]] |
Latest revision as of 21:52, 13 October 2024
This page lists future stations on Britain's railway or tramway networks. Stations are only listed here once work has begun or there is a realistic prospect of the station being completed, rather than those that are simply listed as part of the Restoring Your Railway campaign, for instance. Speculative stations should not be added.
Postponed schemes[edit | edit source]
The following stations and stops previously appeared in the above list, but have become less certain due to a change in circumstances.
Station | CRS code | Operator | Location | Notes |
---|---|---|---|---|
Flood Street | N/A | West Midlands Metro | New spur from Wednesbury | Part of the Wednesbury-Brierley Hill extension. Phase 2 of this extension, from Dudley to Brierley Hill, is currently paused due to funding constraints. |
New Road | ||||
Cinder Bank | ||||
Pedmore Road | ||||
Canal Street | ||||
Waterfront | ||||
Merry Hill | ||||
Brierley Hill |
Recently opened stations[edit | edit source]
Stations previously in the 'Future stations' list will be moved here for a short period following opening.
References[edit | edit source]
- ↑ https://www.yorkshireeveningpost.co.uk/news/transport/white-rose-station-link-bridges-installed-at-new-ps265-million-leeds-rail-station-as-construction-continues-4363215
- ↑ https://metroalliance.co.uk/projects/wednesbury-to-brierley-hill-extension/
- ↑ https://railuk.com/rail-news/new-depot-for-northern-conductors-to-be-built-in-ashington/
- ↑ https://www.northumberlandline.uk/post/northumberland-line-newsletter-december-2022
- ↑ https://www.bbc.co.uk/news/uk-england-birmingham-66037299
- ↑ https://eastwestrail.co.uk/the-project/bicester-to-bletchley
- ↑ 7.0 7.1 https://cardiffjournalism.co.uk/thecardiffian/2024/03/08/delays-to-arrival-of-new-cardiff-train-stations-due-to-open-this-year-with-one-cancellation/
- ↑ https://www.birminghammail.co.uk/black-country/uncertainty-over-new-railway-stations-27540706
- ↑ https://www.newcivilengineer.com/latest/willenhall-and-darlaston-stations-heading-30m-over-budget-as-opening-slips-to-late-2025-15-11-2023/
- ↑ https://www.bbc.co.uk/news/uk-england-south-yorkshire-68556755
- ↑ https://www.pressandjournal.co.uk/fp/news/inverness/5283727/inverness-airport-railway-station-opening-date-revealed/
- ↑ https://www.gwr.com/stations-and-destinations/stations/new-stations/reading-green-park
- ↑ https://www.edinburgh.gov.uk/tramstonewhaven/news/article/419/trams-to-newhaven-passenger-launch-date-announced-as-pilrig-wheels-installed-at-iona-street
- ↑ https://www.bbc.co.uk/news/articles/c0384pvz1m3o
- ↑ https://theisleofthanetnews.com/2023/04/14/thanet-parkway-station-opening-date-moved-from-may-to-july/
- ↑ https://twitter.com/gwrhelp/status/1684220309610668034
- ↑ https://www.railmagazine.com/news/network/2023/10/04/metro-extension-opens-after-three-year-delay
- ↑ https://www.bbc.co.uk/news/uk-england-merseyside-67011369
- ↑ https://www.bbc.co.uk/news/uk-england-london-67679149
- ↑ https://www.thenational.scot/news/24353197.historic-john-swinney-opens-levenmouth-rail-link/
- ↑ Charley's Mk. 1 eyeball
- ↑ https://www.bbc.co.uk/news/uk-england-bristol-64861060
- ↑ https://www.bbc.co.uk/news/articles/cp39pp0yepwo