Editing Harrow-on-the-Hill signal cabin

Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.

Latest revision Your text
Line 32: Line 32:
==Future==
==Future==
Harrow-on-the-Hill signal cabin will be closed as part of the 4LM programme. The combined signalling of the entire SSR made up of the Circle, Hammersmith & City, District, and Metropolitan lines will transfer in phases to [[Hammersmith Service Control Centre]] (SCC), fulfilling the ambition of signal concentration and automation that dates back to the 1960s. 4LM will also see the rollout of [[Communications Based Train Control]] (CBTC) using [[Thales]]' SelTrac, which will do away with most auxiliary colour light signals. Trackside signals will, however, remain in 'interoperable' areas where non-CBTC fitted rolling stock operates over the SSR, in this case being [[Chiltern Railways]] services over the Main Line between Harrow South Junction and Mantles Wood Crossing just beyond [[Amersham]]. 4LM has been split into 14 Signal Migration Areas (SMA), of which Harrow-on-the-Hill signal cabin falls within SMA 9 between Preston Road, West Harrow and Moor Park.<ref> "Underground News". London Underground Railway Society. 706: 572. October 2020.</ref>
Harrow-on-the-Hill signal cabin will be closed as part of the 4LM programme. The combined signalling of the entire SSR made up of the Circle, Hammersmith & City, District, and Metropolitan lines will transfer in phases to [[Hammersmith Service Control Centre]] (SCC), fulfilling the ambition of signal concentration and automation that dates back to the 1960s. 4LM will also see the rollout of [[Communications Based Train Control]] (CBTC) using [[Thales]]' SelTrac, which will do away with most auxiliary colour light signals. Trackside signals will, however, remain in 'interoperable' areas where non-CBTC fitted rolling stock operates over the SSR, in this case being [[Chiltern Railways]] services over the Main Line between Harrow South Junction and Mantles Wood Crossing just beyond [[Amersham]]. 4LM has been split into 14 Signal Migration Areas (SMA), of which Harrow-on-the-Hill signal cabin falls within SMA 9 between Preston Road, West Harrow and Moor Park.<ref> "Underground News". London Underground Railway Society. 706: 572. October 2020.</ref>


== References ==
== References ==
Please note that all contributions to Bradshaw are considered to be released under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 (see Bradshaw:Copyrights for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource. Do not submit copyrighted work without permission!

To edit this page, please answer the question that appears below (more info):

Cancel Editing help (opens in new window)