===1939 construction===
===1939 construction===
From Finchley Road the Jubilee line descends into its central tunnelled section which is formed of classic twin tube tunnels and travels in a broadly southerly direction. This first section of tunnel was excavated between 1933 and 1939 to allow Bakerloo line trains to reach the existing Metropolitan alignment at Finchley Road, this section of line includes [[Swiss Cottage Station|Swiss Cottage]] and [[St. Johns Wood Station|St. Johns Wood]] stations and the Southbound platform at [[Baker Street Station|Baker Street]]. Swiss Cottage and St. Johns Wood stations are both classic 1930s tube stations with a pair of platforms accessed via a central concourse with escalators to the ticket hall.
From Finchley Road the Jubilee line descends into its central tunnelled section which is formed of classic twin tube tunnels and travels in a broadly southerly direction. This first section of tunnel was excavated between 1933 and 1939 to allow Bakerloo line trains to reach the existing Metropolitan alignment at Finchley Road, this section of line includes [[Swiss Cottage Station|Swiss Cottage]] and [[St. Johns Wood Station|St. Johns Wood]] stations and the Southbound platform at [[Baker Street Station|Baker Street]]. Swiss Cottage and St. Johns Wood stations are both classic 1930s tube stations with a pair of platforms accessed via a central concourse with escalators to the ticket hall.
[[File:Charing Cross Station Jubilee line.jpg|alt=Picture shows a 1996 tube stock train sitting in one of the Jubilee line platforms at Charing Cross station|thumb|Jubilee line train at Charing Cross 2019]]


=== Jubilee line phase 1===
=== Jubilee line phase 1===
Line 13: Line 14:
===Jubilee Line Extension===
===Jubilee Line Extension===
To the south of Green Park station a junction allows trains to leaving the Phase 1 alignment and join the Jubilee Line Extension. Heading South trains call at [[Westminster Station|Westminster]] station before turning east and calling at [[Waterloo Station|Waterloo]], [[Southwark Station|Southwark]], [[London Bridge Station|London Bridge]], [[Bermondsey Station|Bermondsey]], [[Canada Water Station|Canada Water]], [[Canary Wharf Station|Canary Wharf]] and [[North Greenwich Station|North Greenwich]]. Just after North Greenwich the line turns to head north and passes under the River Thames for the 3rd time in as many stations and surfaces just before [[Caning Town Station|Caning Town]] station from where it runs in a northwards direction alongside the former [[North London Line]], now [[DLR]], alignment towards Stratford making one more stop at [[West Ham Station|West Ham]] on the way. There are trains that are regularly scheduled to terminate from the west at North Greenwich, where they use the central platform and a handful of trains in the early morning and late evening carry out the reverse move and terminate at Greenwich from the Stratford direction, emergency turnback facilities also exist at Waterloo, London Bridge, Canary Wharf and West Ham. Stratford Market Depot is the main maintenance depot for the Jubilee line and is located between West Ham and Stratford stations access is possible from both stations. The architecture of the Jubilee Line Extension is highly regarded, and features stations of a scale never before seen on the London Underground with particularly noteworthy Stations being those at Westminster and Canary Wharf.
To the south of Green Park station a junction allows trains to leaving the Phase 1 alignment and join the Jubilee Line Extension. Heading South trains call at [[Westminster Station|Westminster]] station before turning east and calling at [[Waterloo Station|Waterloo]], [[Southwark Station|Southwark]], [[London Bridge Station|London Bridge]], [[Bermondsey Station|Bermondsey]], [[Canada Water Station|Canada Water]], [[Canary Wharf Station|Canary Wharf]] and [[North Greenwich Station|North Greenwich]]. Just after North Greenwich the line turns to head north and passes under the River Thames for the 3rd time in as many stations and surfaces just before [[Caning Town Station|Caning Town]] station from where it runs in a northwards direction alongside the former [[North London Line]], now [[DLR]], alignment towards Stratford making one more stop at [[West Ham Station|West Ham]] on the way. There are trains that are regularly scheduled to terminate from the west at North Greenwich, where they use the central platform and a handful of trains in the early morning and late evening carry out the reverse move and terminate at Greenwich from the Stratford direction, emergency turnback facilities also exist at Waterloo, London Bridge, Canary Wharf and West Ham. Stratford Market Depot is the main maintenance depot for the Jubilee line and is located between West Ham and Stratford stations access is possible from both stations. The architecture of the Jubilee Line Extension is highly regarded, and features stations of a scale never before seen on the London Underground with particularly noteworthy Stations being those at Westminster and Canary Wharf.
==Fleet ==
[[File:1996 tube stock in Stratford Market Depot.jpg|alt=Picture shows a train of Jubilee line 1996 tube stock in one of the outside stabling roads of Stratford Depot|left|thumb|Jubilee line 1996 stock train in Stratford Market Depot]]


===Current trains===
===Current trains===
Line 21: Line 25:


==Signalling ==
==Signalling ==
[[File:Jubilee line signaling singage at Stanmore platforms 1 & 2.jpg|alt=Picture shows the view of the railway from Stanmore station looking south from platforms 1 & 2|thumb|View from Stanmore station showing the signage now used for TBTC operations in place of traditional signals. Visible are a EP board indicating this is the start of a location where a train can reenter the TBTC system; an RM hold board indicating that a train in RM mode must seak signaller authority before proceeding past this point; a Route Secure indicator which informs the driver of a train in RM mode that the points have been set; a Direction Indicator which indicates to a driver of a train in ATO or PM modes if the route is set for Canons Park of the sidings and a Rail Gap Indicator.]]
Since 2011 the Jubilee line has been signalled using the Thales SelTrac signalling system the which is used on several railways globally and in London is also installed on the DLR and the Northern line and is in the process of being fitter to the Subsurface Railway as part of the 4 Lines Modernisation project. On the Jubilee and Northern lines this system is known as Transmission Based Train Control (TBTC) by London Underground and achieves Grade of Automation level 2 (GoA2). The system uses inductions loops located in the four foot of the Jubilee line tracks to track the location of the trains and transmit information between the trains and the signalling system, this allows the system to operate as a “Moving Block” system although the system actually uses 25m long block. As a GoA2 system TBTC allow for full automation of the driving of trains, known as Automatic Train Control (ATC) under the supervision of a Train Operator.
Since 2011 the Jubilee line has been signalled using the Thales SelTrac signalling system the which is used on several railways globally and in London is also installed on the DLR and the Northern line and is in the process of being fitter to the Subsurface Railway as part of the 4 Lines Modernisation project. On the Jubilee and Northern lines this system is known as Transmission Based Train Control (TBTC) by London Underground and achieves Grade of Automation level 2 (GoA2). The system uses inductions loops located in the four foot of the Jubilee line tracks to track the location of the trains and transmit information between the trains and the signalling system, this allows the system to operate as a “Moving Block” system although the system actually uses 25m long block. As a GoA2 system TBTC allow for full automation of the driving of trains, known as Automatic Train Control (ATC) under the supervision of a Train Operator.


Please note that all contributions to Bradshaw are considered to be released under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 (see Bradshaw:Copyrights for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource. Do not submit copyrighted work without permission!

To edit this page, please answer the question that appears below (more info):

Cancel Editing help (opens in new window)