Editing SimSig:House Rules

Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.

Latest revision Your text
Line 33: Line 33:
=== Communicating with Control ===
=== Communicating with Control ===


Let the channel know before you call Control. Make sure neighbouring signallers know you're aware of any approaching trains, or ask them to set routes within your area if they see a need while you're out of the channel. You should also inform neighbouring signallers of the reason why you are contacting control, if it is going to cause them a problem, and if a line is blocked due to a technical fault, to not send any trains into the failure to avoid them from getting trapped.
Let the channel know before you call Control. Make sure neighbouring signallers know you're aware of any approaching trains, or ask them to set routes within your area if they see a need while you're out of the channel. You should also inform neighbouring signallers of the reason why you are causing control, if it is going to cause them a problem, and if a line is blocked due to a technical fault, to not send any trains into the failure to avoid them from getting trapped.


Control must be informed of any incident which has the possibility to cause delays to any train, including any technical fault, or a train which has stopped at a station and will be delayed at that station. You must also inform control of what impact this might have on other train running on nearby lines, so that control are aware and are able to take action to attempt to minimise delays to other services. Control must also be aware of any train running delay in excess of ten minutes, especially if it is a train which is contained within the session, either through a chain or as a result of rules in the timetable. Β 
Control must be informed of any incident which has the possibility to cause delays to any train, including any technical fault, or a train which has stopped at a station and will be delayed at that station. You must also inform control of what impact this might have on other train running on nearby lines, so that control are aware and are able to take action to attempt to minimise delays to other services. Control must also be aware of any train running delay in excess of ten minutes, especially if it is a train which is contained within the session, either through a chain or as a result of rules in the timetable. Β 
Please note that all contributions to Bradshaw are considered to be released under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 (see Bradshaw:Copyrights for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource. Do not submit copyrighted work without permission!

To edit this page, please answer the question that appears below (more info):

Cancel Editing help (opens in new window)