Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in or
create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision |
Your text |
Line 17: |
Line 17: |
| Please remember to read over the [[SimSig:Railway Operations Centre]] page and take note of all changes. | | Please remember to read over the [[SimSig:Railway Operations Centre]] page and take note of all changes. |
|
| |
|
| == Overview == | | ==Overview== |
| | | ''To follow.'' |
| === Exeter ===
| |
| There is a good service operating on all routes in the area.
| |
| | |
| Two trains are in Exeter New Yard - 5A10 at signal E666, and 5L28 at signal E628. Both are due to depart at around 07:00.
| |
| | |
| There is a temporary speed restriction on both the Up and the Down line through Dainton Tunnel in both directions, of 15mph for freight and 30mph for passenger following the discovery of a minor trackbed defect overnight.
| |
| | |
| === Westbury ===
| |
| There is a good service operating on all routes in the area with nothing else to note.
| |
| | |
| === Swindon & Didcot ===
| |
| A good service on all routes in the area.
| |
| | |
| 4V50 is at Challow waiting for time, running approximately 30 minutes early.
| |
| | |
| 2P17 is at platform 5 at Didcot, instead of platform 4.
| |
|
| |
|
| ==Panel allocations== | | ==Panel allocations== |