Bradshaw:Glossary: Difference between revisions
No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
'''AWS''': Automatic Warning System | '''AWS''': Automatic Warning System | ||
'''BR''': [[British Rail]] | |||
'''CBTC''': Communications Based Train Control | '''CBTC''': Communications Based Train Control | ||
Line 23: | Line 25: | ||
'''CSDE''': Correct Side Door Enable | '''CSDE''': Correct Side Door Enable | ||
'''CSR''': Cab Secure Radio | |||
'''DCV''': Door Closed Visual | '''DCV''': Door Closed Visual | ||
'''DDA''': Disability Discrimination Act | |||
'''DLR''': [[Docklands Light Railway]] | '''DLR''': [[Docklands Light Railway]] | ||
Line 39: | Line 45: | ||
'''ETRMS''': European Rail Traffic Managment System | '''ETRMS''': European Rail Traffic Managment System | ||
'''FOC''': Freight Operating Company | |||
'''GSM-R''': Global System for Mobile Communications – Railway | '''GSM-R''': Global System for Mobile Communications – Railway | ||
Line 48: | Line 56: | ||
'''IET''': Intercity Express Train | '''IET''': Intercity Express Train | ||
'''LO''': London Overground | '''LO''': [[London Overground]] | ||
'''LOS''': Limit of Shunt | '''LOS''': Limit of Shunt | ||
Line 59: | Line 67: | ||
'''NR''': [[Network Rail]] | '''NR''': [[Network Rail]] | ||
'''NRN''': National Radio Network | |||
'''PEA''': Passenger Emergency Alarm | '''PEA''': Passenger Emergency Alarm | ||
Line 65: | Line 75: | ||
'''PIS''': Passenger Information System | '''PIS''': Passenger Information System | ||
'''PRM''': Persons with Reduced Mobility | |||
'''PSD''': Platform Screen Doors | '''PSD''': Platform Screen Doors | ||
Line 81: | Line 93: | ||
'''SSR''': Sub-Surface Railway | '''SSR''': Sub-Surface Railway | ||
'''TBC''': Traction Brake Controller | '''TBC''': Traction Brake Controller | ||
Line 95: | Line 105: | ||
'''TfL''': [[Transport for London]] | '''TfL''': [[Transport for London]] | ||
'''TOC''': Train Operating Company | |||
'''T/Op''': Train Operator | |||
'''TOPS''': Total Operations Processing System | |||
'''TPWS''': Train Protection and Warning System | '''TPWS''': Train Protection and Warning System | ||
'''TSI''': Technical Specifications for Interoperability | |||
'''TSR''': Temporary Speed Restriction | '''TSR''': Temporary Speed Restriction | ||
'''WDM''': Wrong Direction Move | '''WDM''': Wrong Direction Move |
Revision as of 02:09, 15 February 2021
Not everyone knows all the hundreds of rail-specific acronyms, so if any pop up in conversation on the Discord server, add them and their meaning below so others can look them up.
Please keep these in alphabetical order so it is easy to find a specific term.
4LM: Four Lines Modernisation programme
ARS: Automatic Route Setting
ATC: Automatic Train Control
ATO: Automatic Train Operation
ATP: Automatic Train Protection
AWS: Automatic Warning System
BR: British Rail
CBTC: Communications Based Train Control
CIS: Customer Information System
CSA: Customer Service Assistant
CSDE: Correct Side Door Enable
CSR: Cab Secure Radio
DCV: Door Closed Visual
DDA: Disability Discrimination Act
DRA: Driver Reminder Appliance
DTG-R: Distance to Go Radio
ESDC: Emergency Saloon Door Control
ESR: Emergency Speed Restriction
ETCS: European Train Control System
ETRMS: European Rail Traffic Managment System
FOC: Freight Operating Company
GSM-R: Global System for Mobile Communications – Railway
HST: High Speed Train
IECC: Intergrated Electronic Control Centre
IET: Intercity Express Train
LOS: Limit of Shunt
LUL: London Underground Limited
MOM: Mobile Operations Manager
NR: Network Rail
NRN: National Radio Network
PEA: Passenger Emergency Alarm
PED: Platform Edge Doors
PIS: Passenger Information System
PRM: Persons with Reduced Mobility
PSD: Platform Screen Doors
PSR: Permanent Speed Restriction
REC: Railway Emergency Call
ROC (SimSig): Railway Operating Centre
ROC (Network Rail): Rail Operating Centre
RVAR: Rail Vehicle Accessibility Regulation
SPAD: Signal Passed At Danger
SSR: Sub-Surface Railway
TBC: Traction Brake Controller
TBTC: Transmission Based Train Control
TD: Train Describer
TD (London Underground): Train Description
TfGM: Transport for Greater Manchester
TfL: Transport for London
TOC: Train Operating Company
T/Op: Train Operator
TOPS: Total Operations Processing System
TPWS: Train Protection and Warning System
TSI: Technical Specifications for Interoperability
TSR: Temporary Speed Restriction
WDM: Wrong Direction Move