Bradshaw:Glossary: Difference between revisions
No edit summary |
No edit summary |
||
Line 135: | Line 135: | ||
'''ROC''' ([[Network Rail]]): Rail Operating Centre | '''ROC''' ([[Network Rail]]): Rail Operating Centre | ||
'''RSF''': Right Side Failure | |||
'''RVAR''': Rail Vehicle Accessibility Regulation | '''RVAR''': Rail Vehicle Accessibility Regulation | ||
Line 187: | Line 189: | ||
'''VAR''': Varied Timetable | '''VAR''': Varied Timetable | ||
'''VSTP''': Very Short Term Plan | |||
'''WDM''': Wrong Direction Move | '''WDM''': Wrong Direction Move | ||
'''WSF''': Wrong Side Failure | |||
'''WTT''': Working Timetable | '''WTT''': Working Timetable |
Revision as of 02:51, 15 February 2021
Not everyone knows all the hundreds of rail-specific acronyms and initialisms, so if any pop up in conversation on the Discord server, add them and their meaning below so others can look them up.
Please keep these in alphabetical order so it is easy to find a specific term.
4LM: Four Lines Modernisation programme
ARS: Automatic Route Setting
ASC: Area Signalling Centre
ATC: Automatic Train Control
ATO: Automatic Train Operation
ATP: Automatic Train Protection
AWS: Automatic Warning System
BR: British Rail
BTP: British Transport Police
CAPE: Cancelled At Point of Entry
CBTC: Communications Based Train Control
CIS: Customer Information System
CSA: Customer Service Assistant
CSDE: Correct Side Door Enable
CSR: Cab Secure Radio
DCO: Driver Controlled Operation
DCV: Door Closed Visual
DDA: Disability Discrimination Act
DRA: Driver Reminder Appliance
DTG-R: Distance to Go Radio
DOO: Driver Only Operation
ERU: Emergency Response Unit
ESDC: Emergency Saloon Door Control
ESR: Emergency Speed Restriction
ETCS: European Train Control System
ETRMS: European Rail Traffic Managment System
FOC: Freight Operating Company
GoA: Grade of Automation
GSM-R: Global System for Mobile Communications – Railway
HS1: High Speed 1
HS2: High Speed 2
HST: High Speed Train
IECC: Intergrated Electronic Control Centre
IET: Intercity Express Train
JLE: Jubilee Line Extension
LOS: Limit of Shunt
LOM: Limit of Movement
LPTB: London Passenger Transport Board
LRT: London Regional Transport
LT: London Transport
LTP: Long Term Plan
LUL: London Underground Limited
MOM: Mobile Operations Manager
NR: Network Rail
NRN: National Radio Network
NSE: Network South East
OOL: On Our Lines (This project)
OPO: One Person Operation
PEA: Passenger Emergency Alarm
PED: Platform Edge Doors
PIS: Passenger Information System
PRM: Persons with Reduced Mobility
PSA: Passenger Service Agent
PSB: Power Signal Box
PSD: Platform Screen Doors
PSR: Permanent Speed Restriction
PTI: Platform Train Interface
PTS: Personal Track Safety
REC: Railway Emergency Call
RGI: Rail Gap Indicator
ROC (SimSig:Sessions): Railway Operating Centre
ROC (Network Rail): Rail Operating Centre
RSF: Right Side Failure
RVAR: Rail Vehicle Accessibility Regulation
SPAD: Signal Passed At Danger
SSR: Sub-Surface Railway
STP: Short Term Plan
TBC: Traction Brake Controller
TBTC: Transmission Based Train Control
TC: Track Circuit
TCF: Track Circuit Failure
TD: Train Describer
TD (London Underground): Train Description
TfGM: Transport for Greater Manchester
TfL: Transport for London
TfW: Transport for Wales
TMS: Train Management System
TOC: Train Operating Company
T/Op: Train Operator
TOPS: Total Operations Processing System
TPS: Train Planniong System
TPWS: Train Protection and Warning System
TS: Tube Stock
TSC: Transport Strategy Centre
TSF: Track Section Failure
TSI: Technical Specifications for Interoperability
TSR: Temporary Speed Restriction
UTO: Unattended Train Operation
VAR: Varied Timetable
VSTP: Very Short Term Plan
WDM: Wrong Direction Move
WSF: Wrong Side Failure
WTT: Working Timetable