Jump to content

Sliverlink Trains

From Bradshaw, the companion guide to On Our Lines
Sliverlink Trains
Sliverlink Trains
Overview
Technical
Closed10th of November 2007
Current OperatorNational Express
Former Operator(s)National Express
Total Length130.78km
Number of stations88
TerminiRichmond, Clapham Junction, London Euston
Rolling stockClass 313 EMU
Electrification25kV 50Hz AC OLE, 750V DC Third Rail
Track gaugeStandard gauge (1435mm)
Maximum speed100mph on WCML

Sliverlink Trains normally just called Sliverlink was an operator to the 10th of November 2007 from the 2nd of March 1997, when it was split to form London Overground and combined with Central Trains to form London Midland. Sliverlink was in control of the North London Railways Franchise

Regions

[edit | edit source]

Sliverlink operated two regions which were called Sliverlink Metro and Sliverlink Country

[edit | edit source]

Sliverlink Metro ran the North London Line

[edit | edit source]

Sliverlink CountryMarston Vale Line

Rolling Stock

[edit | edit source]

Stations

[edit | edit source]

References

[edit | edit source]
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.