Sliverlink Trains
Appearance
| Sliverlink Trains | |
|---|---|
| Sliverlink Trains | |
| Overview | |
| Technical | |
| Closed | 10th of November 2007 |
| Current Operator | National Express |
| Former Operator(s) | National Express |
| Total Length | 130.78km |
| Number of stations | 88 |
| Termini | Richmond, Clapham Junction, London Euston |
| Rolling stock | Class 313 EMU |
| Electrification | 25kV 50Hz AC OLE, 750V DC Third Rail |
| Track gauge | Standard gauge (1435mm) |
| Maximum speed | 100mph on WCML |
Sliverlink Trains normally just called Sliverlink was an operator to the 10th of November 2007 from the 2nd of March 1997, when it was split to form London Overground and combined with Central Trains to form London Midland. Sliverlink was in control of the North London Railways Franchise
Regions
[edit | edit source]Sliverlink operated two regions which were called Sliverlink Metro and Sliverlink Country
Sliverlink Metro
[edit | edit source]Sliverlink Metro ran the North London Line
Sliverlink Country
[edit | edit source]Sliverlink CountryMarston Vale Line