SimSig:Sessions/Archive/2: Difference between revisions

From Bradshaw, the companion guide to On Our Lines
m (Jarley moved page SimSig:Sessions/2 to SimSig:Sessions/Archive/2 without leaving a redirect)
 
(16 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{infobox Sessions
{{infobox Sessions
|image = File:SimSig Session 2.png
|imagewidth = 300px
|session = 2 - East Coast Mainline
|session = 2 - East Coast Mainline
|date = 13 February 2021
|date = 13 February 2021
|start =  
|start = 1900
|simulations = [[SimSig:King's Cross|King's Cross]], [[SimSig:Peterborough|Peterborough]], [[SimSig:Royston|Royston]]
|simulations = [[SimSig:King's Cross|King's Cross]], [[SimSig:Peterborough|Peterborough]] and [[SimSig:Royston|Royston]]
|simdate =  
|simdate = 15 April 2010
|simstart =  
|simstart = 0800
|hosts =  
|hosts = {{SimSig|CallMeFlick|host=1}}<br />{{SimSig|TC60054|host=1}}
|alerts =  
|alerts = All routes - {{alert level|none}}
|list = yes
|}}
|}}
{{Session countdown|Session 2|20210213}}
{{Session countdown|Session 2|20210213}}
''[[On Our Lines]]''' second [[SimSig]] [[SimSig:Sessions|Session]] is taking place on Saturday 13 February 2021. The Session will consist of a chain between [[SimSig:King's Cross|King's Cross]], [[SimSig:Peterborough|Peterborough]] and [[SimSig/Royston|Royston]] power signal boxes. All are free simulations. There are panels to suit all abilities available, and newcomers are welcome. The Session will be available to join from around 1845 for a 1900 start. You can join {{discord|#on-our-simsig-lobby}} at any time for the pre-session chat. We will have a halftime break at 2200, and anticipate finishing the session at around 0100; please let us know if you need to leave before then.
''[[On Our Lines]]''' second [[SimSig]] [[SimSig:Sessions|Session]] is taking place on Saturday 13 February 2021. The Session will consist of a chain between [[SimSig:King's Cross|King's Cross]], [[SimSig:Peterborough|Peterborough]] and [[SimSig:Royston|Royston]] power signal boxes. All are free simulations. There are panels to suit all abilities available, and newcomers are welcome. The Session will be available to join from around 1845 for a 1900 start. You can join {{discord channel|#on-our-simsig-lobby}} at any time for the pre-session chat. We will have a halftime break at 2200, and anticipate finishing the session at around 0100; please let us know if you need to leave before then.


To sign up please edit the page and in the Participants section at the bottom enter your user name, your availability, experience level and which paid simulations you have, if any; if you have a preferred panel you can also list it here although this cannot be guaranteed.
To sign up please edit the page and in the Participants section at the bottom enter your user name, your availability, experience level and which paid simulations you have, if any; if you have a preferred panel you can also list it here although this cannot be guaranteed.


==Overview==
==Overview==
''To follow.''
Good morning East Coast signallers, this is your update from Network Rail regional control at 0800 hours. We currently have no reported incidents across the area and all routes are running with a good service.
 
===All areas===
{{Alert level big
| code = none
| info = Good service on all routes.
}}
There is no information of note.
 
===King's Cross===
A good service is operating on all routes. There is a platform alteration at King's Cross, with platform one blocked by a four-car unit until 0915, vice platform 7.
 
6E52 has been diverted via Welwyn, vice Hertford loop, due to the driver not having the appropriate route knowledge. Signallers are requested to regulate this train as appropriate to ensure it does not leave the King's Cross area significantly early.
 
===Royston===
A good service is operating on all routes.
{{-}}
 
===Peterborough===
{{Alert level big
| code = green
| info = Localised late running to southbound First Capital Connect services due to congestion earlier.
}}
There has been some localised late running of first southbound services due to congestion in the Peterborough area. Late running 1P54 is to be looped at Sandy to allow 1A05 to pass.


==Panel allocations==
==Panel allocations==
{| class="wikitable sortable"
{| class="wikitable sortable"
! colspan="4" | Region Controller on Duty: {{SimSig|Jarley|control=1}}
|-
! Power Signal Box
! Power Signal Box
! Controller on duty
! Controller on duty
Line 25: Line 51:
! Signaller on duty
! Signaller on duty
|-
|-
| rowspan=5 | King's Cross
| rowspan=5 | [[SimSig:King's Cross|King's Cross <abbr title="Signal box prefix code">(K)</abbr>]]
| rowspan=5 |
| rowspan=5 | {{SimSig|TC60054|host=1|control=1}}
| Cross
| Cross
|  
| {{SimSig|Jack}}
|-
|-
| Finsbury
| Finsbury
|
| {{SimSig|Lcawte}}
|-
|-
| Palace
| Palace
|
| {{SimSig|MichaelDono}}
|-
|-
| Welwyn
| Welwyn
|
| {{SimSig|Goldenarrow}}
|-
|-
| Hitchin
| Hitchin
|
| {{SimSig|TheTramwayGay648}}
|-
|-
| rowspan=5 | Peterborough
| rowspan=5 | [[SimSig:Peterborough|Peterborough <abbr title="Signal box prefix code">(P)</abbr>]]
| rowspan=5 |
| rowspan=6 | {{SimSig|CallMeFlick|host=1|control=1}}
| Hitchin-Tempsford
| Hitchin-Tempsford
|
| rowspan=2 | <small>''Until 1000''</small> {{SimSig|Mrdannyp}}<br /><small>''From 1000''</small> {{SimSig|MinionJosh}}
|-
|-
| Little Barford-Stilton
| Little Barford-Stilton
|
|-
|-
| Peterborough
| Peterborough
|
| rowspan=2 | {{SimSig|Mike1901}}
|-
|-
| New England
| New England
|
|-  
|-  
| Helpston-Stoke
| Helpston-Stoke
|
| <small>''Until 1130''</small> {{SimSig|livioisok}}<br /><small>''From 1130''</small> {{SimSig|Laurencec123}}
|-
|-
| [[SimSig:Royston|Royston <abbr title="Signal box prefix code">(R)</abbr>]]
| Royston
| Royston
|
| {{SimSig|Jarley}}
| Royston
|-
|
|}
|}
==Incident log==
*0800 - Signal failure at New England north junction (reported 0825)
*0810 - Points failure at Sandy
*0815 - Dispatch issues at Hertford North due to staff shortage
*0815 - Track circuit failure at Tallington.
*0842 - Highbury & Islington closed due to overcrowding
*0903 - Hertford North now fully staffed
*0913 - 1A91 reports fire bells sounding as leaving Welwyn Tunnel. Train is just berthed within Welwyn North station.
*0921 - Hertfordshire Fire and Rescue Fire Officer Trevor Townsend on site at Welwyn North.
*0923 - Network Rail Mobile Operations Manager Fran Franklin on site at Welwyn North.
*0930 - Highbury & Islington now fully open.
*1000 - Down Fast at Welwyn North now open to diesel traffic only.
*1018 - Overhead Line Equipment now re-energised at Welwyn North on the Down Fast only.
*1034 - Level crossing infringement at Everton Crossing. Level crossing barriers struck by HGV.
*1112 - Person under train at Essex Road. All lines blocked.
*1138 - Points failure at Sandy resolved.
*1148 - Coupling of rescue locomotive 1Z99 completed. On the move 1154 to Welwyn sidings.
*1157 - Essex Road all clear given.


==Participants==
==Participants==
Line 79: Line 122:
*{{SimSig|Mrdannyp}}
*{{SimSig|Mrdannyp}}
*{{SimSig|Mike1901}} - A Peterborough panel if possible please
*{{SimSig|Mike1901}} - A Peterborough panel if possible please
*{{SimSig|ConductorShoeTheMusical}} - Assistant Controller please! (Available until 2300)
*{{SimSig|TC60054}}
*{{SimSig|TC60054}}
*{{SimSig|TheTramwayGay648}} - preferably Welwyn or Hitchin panel, please.
*{{SimSig|TheTramwayGay648}} - preferably Welwyn or Hitchin panel, please.
Line 85: Line 127:
*{{SimSig|Jack}} - available anywhere, no relevant £ sims
*{{SimSig|Jack}} - available anywhere, no relevant £ sims
*{{SimSig|MichaelDono}} - Any panel on KGX, preference of Palace.
*{{SimSig|MichaelDono}} - Any panel on KGX, preference of Palace.
*{{SimSig|CallMeFlick}}
<!--Please sign up above, using the {{SimSig}} template. This will generate useful links automatically. Please indicate your availability, experience level and which paid simulations you have, if any.-->
<!--Please sign up above, using the {{SimSig}} template. This will generate useful links automatically. Please indicate your availability, experience level and which paid simulations you have, if any.-->
<!--Don't edit below this line!!-->
<!--Don't edit below this line!!-->

Latest revision as of 00:46, 2 March 2024

SimSig Sessions
On Our Lines plays SimSig
2 - East Coast Mainline
Date13 February 2021
Start time1900
Host(s)CallMeFlick (talk) host
TC60054 (talk) host
Simulation Information
Simulations in useKing's Cross, Peterborough and Royston
Sim date15 April 2010
Sim time0800
Service alertsAll routes - code none

On Our Lines' second SimSig Session is taking place on Saturday 13 February 2021. The Session will consist of a chain between King's Cross, Peterborough and Royston power signal boxes. All are free simulations. There are panels to suit all abilities available, and newcomers are welcome. The Session will be available to join from around 1845 for a 1900 start. You can join #on-our-simsig-lobby at any time for the pre-session chat. We will have a halftime break at 2200, and anticipate finishing the session at around 0100; please let us know if you need to leave before then.

To sign up please edit the page and in the Participants section at the bottom enter your user name, your availability, experience level and which paid simulations you have, if any; if you have a preferred panel you can also list it here although this cannot be guaranteed.

Overview[edit | edit source]

Good morning East Coast signallers, this is your update from Network Rail regional control at 0800 hours. We currently have no reported incidents across the area and all routes are running with a good service.

All areas[edit | edit source]

Incident Level

Code unknown
Code unknown

Service status unknown.

[viewpurgeupdate]


Good service on all routes.

There is no information of note.

King's Cross[edit | edit source]

A good service is operating on all routes. There is a platform alteration at King's Cross, with platform one blocked by a four-car unit until 0915, vice platform 7.

6E52 has been diverted via Welwyn, vice Hertford loop, due to the driver not having the appropriate route knowledge. Signallers are requested to regulate this train as appropriate to ensure it does not leave the King's Cross area significantly early.

Royston[edit | edit source]

A good service is operating on all routes.


Peterborough[edit | edit source]

Incident Level

Code unknown
Code unknown

Localised service hold.

[viewpurgeupdate]


Localised late running to southbound First Capital Connect services due to congestion earlier.

There has been some localised late running of first southbound services due to congestion in the Peterborough area. Late running 1P54 is to be looped at Sandy to allow 1A05 to pass.

Panel allocations[edit | edit source]

Region Controller on Duty: Jarley (talk)
Power Signal Box Controller on duty Panel Signaller on duty
King's Cross (K) TC60054 (talk) host Cross Jack (talk)
Finsbury Lcawte (talk)
Palace MichaelDono (talk)
Welwyn Goldenarrow (talk)
Hitchin TheTramwayGay648 (talk)
Peterborough (P) CallMeFlick (talk) host Hitchin-Tempsford Until 1000 Mrdannyp (talk)
From 1000 MinionJosh (talk)
Little Barford-Stilton
Peterborough Mike1901 (talk)
New England
Helpston-Stoke Until 1130 livioisok (talk)
From 1130 Laurencec123 (talk)
Royston (R) Royston Jarley (talk)

Incident log[edit | edit source]

  • 0800 - Signal failure at New England north junction (reported 0825)
  • 0810 - Points failure at Sandy
  • 0815 - Dispatch issues at Hertford North due to staff shortage
  • 0815 - Track circuit failure at Tallington.
  • 0842 - Highbury & Islington closed due to overcrowding
  • 0903 - Hertford North now fully staffed
  • 0913 - 1A91 reports fire bells sounding as leaving Welwyn Tunnel. Train is just berthed within Welwyn North station.
  • 0921 - Hertfordshire Fire and Rescue Fire Officer Trevor Townsend on site at Welwyn North.
  • 0923 - Network Rail Mobile Operations Manager Fran Franklin on site at Welwyn North.
  • 0930 - Highbury & Islington now fully open.
  • 1000 - Down Fast at Welwyn North now open to diesel traffic only.
  • 1018 - Overhead Line Equipment now re-energised at Welwyn North on the Down Fast only.
  • 1034 - Level crossing infringement at Everton Crossing. Level crossing barriers struck by HGV.
  • 1112 - Person under train at Essex Road. All lines blocked.
  • 1138 - Points failure at Sandy resolved.
  • 1148 - Coupling of rescue locomotive 1Z99 completed. On the move 1154 to Welwyn sidings.
  • 1157 - Essex Road all clear given.

Participants[edit | edit source]