Bradshaw:Glossary: Difference between revisions

From Bradshaw, the companion guide to On Our Lines
(→‎R: rename ROC)
 
(271 intermediate revisions by 12 users not shown)
Line 1: Line 1:
''For three-letter station codes see [[CRS codes]].''
{{for|three-letter station codes|CRS codes}}
 
{{shortcut|B:G}}
Not everyone knows all the hundreds of rail-specific acronyms and initialisms, so if any pop up in conversation on the [[Discord]] server, add them and their meaning below so others can look them up.
Not everyone knows all the hundreds of rail-specific acronyms and initialisms, so if any pop up in conversation on the [[Discord]] server add them and their meaning below so others can look them up.
 
Please keep these in alphabetical order so it is easy to find a specific term.


Please keep these in alphabetical order so that it is easy to find a specific term.
{{Compacttoc|right=yes|num=yes}}
== 0-9 ==
== 0-9 ==
*'''4LM''': Four Lines Modernisation programme
*'''4LM''': [[Four Lines Modernisation]] programme
*'''4 Foot''' The space between the two running rails on a section of track
*'''6 Foot''' The area between a pair of running lines
*''' 10 Foot''' The area between two pairs of running lines
== A ==
== A ==
*'''AB''': Absolute Block
*'''ABCL''': Automatic Barrier Crossing, Locally Monitored
*'''ABDO''': Automatic Braking and Door Opening
*'''ACOA''': Adverse Change Of Aspect
*'''ACOA''': Adverse Change Of Aspect
*'''ARL''': Arriva Rail London
*'''ACWN''': Altered Carriage Working Notice
*'''AHB''': Automatic Half-Barrier Crossing
*'''AHBC''': Automatic Half-Barrier Crossing
*'''ANP''': Auto Not Permitted
*:An operating state on [[London Underground]] lines using Automatic Train Operations (ATO), where trains have been prevented from operating in ATO mode and must instead operate in [[#C|CM]] or [[#P|PM]], generally initiated due to staff on or around the track area.
*'''AOCL''': Automatic Open Crossing, Locally Monitored
*'''ARL''': [[London Overground|Arriva Rail London]]
*'''ARS''': Automatic Route Setting
*'''ARS''': Automatic Route Setting
*'''ASC''': Area Signalling Centre
*'''ASC''': Area Signalling Centre
*'''ASDO''': Automatic Selective Door Opening. See also [[#S|SDO]] and [[#U|UDS]]
*'''ATC''': Automatic Train Control
*'''ATC''': Automatic Train Control
*'''ATO''': Automatic Train Operation
*'''ATO''': Automatic Train Operation
*'''ATOC''': Association of Train Operating Companies
*'''ATOC''': [[ATOC|Association of Train Operating Companies]]
*'''ATP''': Automatic Train Protection
*'''ATP''': Automatic Train Protection
*'''ATW''': Arriva Trains Wales
*'''ATS''': Automatic Tram Stop
*'''AWC''': Avanti West Coast
*'''ATW''': [[Arriva Trains Wales]]
*'''AWC''': [[Avanti West Coast]]
*'''AWS''': Automatic Warning System
*'''AWS''': Automatic Warning System
== B ==
== B ==
{| class="wikitable"
[[File:British Rail - colour reversed logo.svg|right|thumb|The [[British Rail]] '[[Arrows of Indecision]]'.]]
|+ Caption text
*'''BML''': [[Brighton Main Line]]
|-
*'''BR''': [[British Rail]]
! Header text !! Header text
*'''BTC''': British Transport Commission
|-
*'''BTP''': British Transport Police
| '''BML''' || Brighton Main Line
|-
| BR || [[British Rail]]
|-
| '''BTP''' || British Transport Police
|}
 
== C ==
== C ==
*'''C+H''': Circle and Hammersmith & City Lines
[[File:Hammersmith tube station (Circle and Hammersmith & City lines) MMB 01 C-Stock.jpg|right|thumb|Hammersmith station, which is the terminus of the [[Circle line|Circle]] and [[Hammersmith & City line|Hammersmith & City Lines]]]]
*'''C+H''': [[Circle line|Circle]] and [[Hammersmith & City line]]s
*'''CAPE''': Cancelled At Point of Entry
*'''CAPE''': Cancelled At Point of Entry
*'''CAWS''': Continuous Automatic Warning System
*'''CBTC''': Communications Based Train Control
*'''CBTC''': Communications Based Train Control
*:Name given to the [[SelTrac]] installation being installed on [[London Underground|London Underground’s]] SSR as part of the [[Four Lines Modernisation]] (4LM) project to enable Automatic Train Operation. See also [[#T|TBTC]] and [[#D|DTG-R]]
*'''CD''': Close Doors (indication)
*'''CDL''': Central Door Locking
*'''CDP''': Continuous Development Programme
*'''Cess''': The area along either side of a railway line which is kept at a lower level than the sleeper bottom, in order to provide drainage. May also be considered as a place of safety.
*'''CIS''': Customer Information System
*'''CIS''': Customer Information System
*'''CLR''': Central London Railway
*'''CM''': Coded Manual
*'''CM''': Coded Manual
*:A mode of operation used on [[London Underground|London Underground’s]] [[Central line|Central]] and [[Victoria line|Victoria]] lines where the Train Operator drives the train manually at up to normal line speed using signalling information provided on an in-cab display. See also [[#P|PM]]
*'''CMS''': Competency Management System
*'''Corridor of Doom''': A liminal space of substantial length inspired by those located at King's Cross St. Pancras and Green Park stations on the London Underground
*'''(C)[[COS]]''': ([[Crossrail]]) Central Operation Section
*:The [[Elizabeth line]] between [[Abbey Wood]] and [[Paddington]] via Central London. Sometimes incorrectly referred to as the ''Crossrail Core''.
*'''CoT''': Close of Traffic
*'''CoT''': Close of Traffic
*'''CR''': Chiltern Railways
*'''CR''': [[Chiltern Railways]]
*'''CRS''': Computer Reservation System
*'''CRS''': Computer Reservation System
*'''CS''': Caledonian Sleeper
*'''CS''': [[Caledonian Sleeper]]
*'''CSA''': Customer Service Assistant
*'''CSA''': Customer Service Assistant
*'''CSDE''': Correct Side Door Enable
*'''CSDE''': Correct Side Door Enable
*'''CSL2''': Customer Service Level 2
*'''CSL2''': Customer Service Level 2
*'''CSLR''': City & South London Railway
*'''CSR''': Cab Secure Radio
*'''CSR''': Cab Secure Radio
 
*'''CTBC''': Combined Traction Brake Controller, See also [[#T|TBC]]
*'''CTRL''': Channel Tunnel Rail Link
*'''CWN''': Carriage Working Notice
== D ==
== D ==
[[File:Tower Gateway DLR station.jpg|right|thumb|[[Tower Gateway]] station of the [[Docklands Light Railway]] in East London.]]
*'''DCO''': Driver Controlled Operation
*'''DCO''': Driver Controlled Operation
*'''DCV''': Door Closed Visual
*: A system of operation on the [[National Rail]] network where a train operates with both a driver and at least one other member of staff onboard, but where the driver is responsible for operation of the trains doors as well as driving the train.
*'''DCV''': Doors Closed Visual
*'''DDA''': Disability Discrimination Act
*'''DDA''': Disability Discrimination Act
*'''DISI''': Defective in Service Instructions
*'''DLR''': [[Docklands Light Railway]]
*'''DLR''': [[Docklands Light Railway]]
*'''DOO''': Driver Only Operation
*'''DOO''': Driver Only Operation
*: A system of operation on the [[National Rail]] Network where the only member of operational staff onboard a train is the driver who is responsible for all aspects of the trains operation. Analogous to [[#O|OPO]] on [[London Underground]]
*'''DRA''': Driver Reminder Appliance
*'''DRA''': Driver Reminder Appliance
*'''DRM''': Duty Reliability Manager ([[London Underground]] equivalent of Mobile Operations Manager [MOM].)
*'''DRS''': [[Direct Rail Services]]
*'''DSD''': Driver's Safety Device
*'''DTG-R''': Distance to Go Radio
*'''DTG-R''': Distance to Go Radio
*: Automatic Train Operation system in use on [[London Underground|London Underground’s]] [[Victoria line]]. See also [[#C|CBTC]] and [[#T|TBTC]]
*'''DVA''': Digital Voice Announcer
*'''DVA''': Digital Voice Announcer
== E ==
== E ==
*'''E*''': Eurostar
*'''E*''': [[Eurostar]]
*'''ECML''': East Coast Main Line
*'''ECML''': [[East Coast Main Line]]
*'''EMR''': East Midlands Railway
*'''ECS''': Empty Coaching Stock
*'''EMT''': East Midnland Trains
*'''EDNE''': Emergency Do Not Enter sign
*'''ERTMS''': European Rail Traffic Managment System
*'''ELL''': East London Line
*'''EMR''': [[East Midlands Railway]]
*'''EMT''': [[East Midlands Trains]]
*'''EP''': Entry Point
*'''EPH''': Electric Point Heater
*'''ERTMS''': European Rail Traffic Management System
*'''ERU''': Emergency Response Unit
*'''ERU''': Emergency Response Unit
*'''ES''': [[Eurostar]]
*'''ESDC''': Emergency Saloon Door Control
*'''ESDC''': Emergency Saloon Door Control
*'''ESR''': Emergency Speed Restriction
*'''ESR''': Emergency Speed Restriction
*'''ESTL''': End State Track Layout, a programme of track rationalisation as part of the [[London Underground]]'s [[Four Lines Modernisation]].
*'''ETCS''': European Train Control System
*'''ETCS''': European Train Control System
== F ==
== F ==
*'''FGW''': First Great Western
[[File:Class 745 Cerhenice.jpg|right|thumb|A [[Greater Anglia]] [[class 745]] [[FLIRT]] intercity train.]]
*'''FGW''': [[First Great Western]]
*'''[[FLIRT]]''': Fast Light Intercity and Regional Train
*'''FOC''': Freight Operating Company
*'''FOC''': Freight Operating Company
*'''FPI''': Facing Points Indicator
*'''FPL''': Facing Point Lock
*'''FRL''': Fixed Red Light
== G ==
== G ==
*'''GA''': Greater Anglia
*'''GA''': [[Greater Anglia]]
*'''GC''': Great Central
*'''GBR''': [[Great British Railways]]
*'''GN''': Great Northern
*'''GC''': [[Great Central]]
*'''GEML''': [[Great Eastern Main Line]]
*'''GLA''': Greater London Area
*'''GLA''': Greater London Authority
*'''GLC''': Greater London Council
*'''GN''': [[Great Northern]]
*'''GoA (0-4)''': Grade of Automation
*'''GoA (0-4)''': Grade of Automation
*'''GOBLIN''': [[Gospel Oak]] to [[Barking]] Line
*'''GOP''': Guard's Operating Panel
*'''GSM-R''': Global System for Mobile Communications – Railway
*'''GSM-R''': Global System for Mobile Communications – Railway
*'''GTR''': Govia Thameslink Railway
*'''GTR''': [[Govia Thameslink Railway]]
*'''GWML''': Great Western Main Line
*'''GWML''': [[Great Western Main Line]]
*'''GWR''': Great Western Railway
*'''GWR''': [[Great Western Railway]]
*'''GX''': Gatwick Express
*'''GX''': [[Gatwick Express]]
== H ==
== H ==
*'''HEX''': Heathrow Express
[[File:Hull Trains Class 802.jpg|thumb|A [[Hull Trains]] [[class 802]] at [[St. Pancras]]]]
*'''HML''': Highland Main Line
*'''HEX''': [[Heathrow Express]]
*'''HML''': [[Highland Main Line]]
*'''HS1''': High Speed 1
*'''HS1''': High Speed 1
*'''HS2''': High Speed 2
*'''HS2''': High Speed 2
*'''HST''': [[High Speed Train]]
*'''HST''': [[High Speed Train]]
*'''HT''': Hull Trains
*'''HT''': [[Hull Trains]]
== I ==
== I ==
[[File:Liverpool Street Interlocking Machine Room (2954778782).jpg|right|thumb|[[Liverpool Street]] Interlocking Machine Room on the [[London Underground]].]]
*'''IBJ''': Insulated Block Joint (aka IRJ)
*'''IC''': Intercity
*'''IC''': Intercity
*'''IECC''': Intergrated Electronic Control Centre
*'''IECC''': Integrated Electronic Control Centre
*'''IEP''': Interciy Express Program
*'''IEP''': Intercity Express Programme
*'''IET''': Intercity Express Train
*'''IET''': Intercity Express Train
*'''IMR''': Interlocking Machine Room
*'''IMR''': Interlocking Machine Room
*'''IoW''': Isle of Wight
*'''IoW''': Isle of Wight
*'''IRJ''': Insulated Rail Joint (aka IBJ)
== J ==
== J ==
[[File:CanadaWater-Jubileeplatforms4.jpg|right|thumb|Platform Edge Doors at [[Canada Water]] station on the [[Jubilee line|Jubilee Line Extension]].]]
*'''Jish''': Also known as Josh.
*'''Jishlish''': [[Jishlish]] is the language and myriad of mistakes spoken and typed by Jish.
*'''JLE''': Jubilee Line Extension
*'''JLE''': Jubilee Line Extension
*:The section of the [[Jubilee line]] between [[Green Park]] and [[Stratford]], opened in 1999.
== K ==
== K ==
*'''KYT''': Know Your Train
*'''KVB''': Contrôle de Vitesse par Balises
*:Translated from French to English as Speed Control by Beacons. A speed control system used on the French national rail network, Channel Tunnel and High Speed 1.
*'''KYT''': [[Know Your Train]][https://www.realtimetrains.co.uk/about/knowyourtrain/]
== L ==
== L ==
*'''LM''': London Midland
*'''LM''': [[London Midland]]
*'''LNER''': London North Eastern Railway
*'''LNER''': [[London North Eastern Railway]]
*'''LNR''': London Northwestern Railway
*'''LNR''': [[London Northwestern Railway]]
*'''LO''': [[London Overground]]
*'''LO''': [[London Overground]]
*'''LOM''': Limit of Movement
*'''LOM''': Limit of Movement
*'''LOROL''': London Overground Rail Opration Ltd.
*'''LOROL''': [[London Overground|London Overground Rail Operations Ltd.]]
*'''LOS''': Limit of Shunt
*'''LOS''': Limit of Shunt
*'''LPTB''': London Passenger Transport Board
*'''LPTB''': London Passenger Transport Board
*'''LRT''': London Regional Transport
*'''LRT''': London Regional Transport
*'''LSL''': Locomtive Services Limited
*'''LRV''': Light Rail Vehicle
*'''LSL''': Locomotive Services Limited
*'''LT''': London Transport
*'''LT''': London Transport
*'''LTE''': London Transport Executive
*'''LTM''': [[London Transport Museum]]
*'''LTM''': [[London Transport Museum]]
*'''LTP''': Long Term Plan
*'''LTP''': Long Term Plan
*'''LUL''': [[London Underground]] Limited
*'''LUL''': [[London Underground|London Underground Ltd.]]
 
== M ==
== M ==
*'''MDR''': Metropolitain District Railway
[[File:METROPOLITAN RAILWAYS LOCO AT THE RAILFEST YORK JUNE 2012 (7346296244).jpg|right|thumb|Metropolitan Railway electric locomotive [[Sarah Siddons]].]]
*'''MENTOR''': Mobile Electric Network Testing Observation and Recording
*'''MDR''': [[District line|Metropolitan District Railway]]
*'''MML''': Midland Main Line
*'''[[MENTOR]]''': Mobile Electric Network Testing Observation and Recording
*'''MML''': [[Midland Main Line]]
*'''MOM''': Mobile Operations Manager
*'''MOM''': Mobile Operations Manager
*'''MR''': Metropolitan Railway
*'''MR''': [[Metropolitan line|Metropolitan Railway]]
*'''MTR''': Mass Transit Railway (Hong Kong Subway)
*'''MTR''': Mass Transit Railway (Hong Kong Subway)
== N ==
== N ==
[[File:New Measurement train Danesmoor.jpg|right|thumb|The [[Network Rail]] [[New Measurement Train]], formed of [[High Speed Train]] rolling stock.]]
*'''NCT''': Non-Communicating Train
*'''NIRM''': Network Incident Response Manager
*'''NLC''': National Location Codes
*'''NLC''': National Location Codes
*'''NLE''': Northern Line Extension
*'''NLE''': Northern Line Extension
*'''NMT''': New Messurement Train
*'''NLL''': North London Line
*'''NMT''': New Measurement Train
*'''NR''': [[Network Rail]]
*'''NR''': [[Network Rail]]
*'''NR''': Northern Rail
*'''NR''': [[Northern Rail]]
*'''NRM''': [[National Railway Museum]]
*'''NRM''': [[National Railway Museum]]
*'''NRN''': National Radio Network
*'''NRN''': National Radio Network
*'''NSE''': Network South East
*'''NSE''': [[Network South East]]
*'''NTCO''': Not To Call Order
*'''NTCO''': Not To Call Order
 
*'''NUCKLE''': NUneaton, Coventry, Kenilworth and LEamington Spa
*:A package of improvement works to the rail corridor between [[Nuneaton]], [[Coventry]], [[Kenilworth]] and [[Leamington Spa]], including new stations, signalling, track and other associated improvements.
== O ==
== O ==
*'''OA''': Open Access
*'''OA''': Open Access
*'''OCS''': Overhead Contact System
*'''OCS''': Overhead Contact System
*'''OHLE''': Overhead Line Equipment
*'''OLE''': Overhead Line Equipment
*'''OLE''': Overhead Line Equipment
*'''ONA''': Operator Not Available
*'''OOL''': [[On Our Lines]] (this project)
*'''OPO''': One Person Operation
*:The term used by [[London Underground]] to describe the running of trains where the only member of operation staff required is a T/Op. Analogous to Driver Only Operation (DOO) on [[National Rail]]
*'''OR''': Operational Restriction
*:A limitation placed on the [[#C|CBTC]] system
*'''ORR''': Office of Rail and Road
*'''ORR''': Office of Rail and Road
*'''OOL''': [[On Our Lines]] (This project)
*'''OPO''': One Person Operation
== P ==
== P ==
[[File:4-PEP-4002.jpg|right|thumb|A British Rail 'PEP' unit.]]
*'''PDL''': Portsmouth Direct Line
*'''PEA''': Passenger Emergency Alarm
*'''PEA''': Passenger Emergency Alarm
*'''PED''': Platform Edge Doors
*'''PED''': Platform Edge Doors
*'''PEP''': Prototype Electro Pneumatic Train
*'''PEP''': Prototype Electro Pneumatic Train. Often used to refer to the classes based on the prototypes; classes [[class 313|313]], [[class 314|314]], [[class 315|315]], [[class 507|507]] & [[class 508|508]].
*'''PIOT''': Passenger Ill on Train
*'''PIS''': Passenger Information System
*'''PIS''': Passenger Information System
*'''PLPR (1-4)''': Plain Line Pattern Recognition
*'''PLPR (1-4)''': Plain Line Pattern Recognition
*'''PM''': Protected Manual
*'''PM''': Protected Manual
*: A mode of operation used on [[London Underground|London Underground’s]] [[Jubilee line|Jubilee]] and [[Northern line|Northern]] lines and parts of the [[Circle line|Circle]], [[District line|District]], [[Hammersmith & City line|Hammersmith & City]] and [[Metropolitan line|Metropolitan lines]] where Automatic Train Operation is provided. In this mode the Train Operator drives the train manually at up to normal line speed using signalling information provided on an in-cab display. See also [[#C|CM]]
*'''PoSA''': Proceed-on-Sight Authority
*'''PPE''': Personal Protective Equipment
*'''PPI''': Points Position Indicator
*'''PRI''': Preliminary Route Indicator
*'''PRM''': Persons with Reduced Mobility
*'''PRM''': Persons with Reduced Mobility
*'''PSA''': Passenger Service Agent
*'''PSA''': Passenger Service Agent
*'''PSB''': Power Signal Box
*'''PSB''': Power Signal Box
*'''PSD''': Platform Screen Doors
*'''PSD''': Platform Screen Doors
*:Full height doors along the edge of the platform, synchronised to the train doors, that improve safety and can help manage tunnel ventilation
*'''PSR''': Permanent Speed Restriction
*'''PSR''': Permanent Speed Restriction
*'''PTI''': Platform Train Interface
*'''PTI''': Platform Train Interface
*'''PTS''': Personal Track Safety
*'''PTS''': Personal Track Safety
*'''PU''': Pick Up
*:A term used to refer to a member of train crew's next train working
== Q ==
== Q ==
*'''Q Code train''': A train that runs as required
== R ==
== R ==
*'''RA''': Right Away (Indication)
*'''RAIB''' Rail Accident Investigation Branch
*'''RAIB''' Rail Accident Investigation Branch
*'''RAT''': Rail Adhesion Train
*'''RAT''': Rail Adhesion Train
*'''RDG''': Rail Delivery Group
*:A number of trains which operate on some [[London Underground]] lines during the autumn, spraying sandite onto rails to improve rail head conditions. See also RHTT
*'''RCC''': Rear Cab Clear (plunger)
*'''RDG''': [[Rail Delivery Group]]
*'''REC''': Railway Emergency Call
*'''REC''': Railway Emergency Call
*'''RGI''': Rail Gap Indicator
*'''RGI''': Rail Gap Indicator
*'''RHTT''': Rail Head Treatment Train
*'''RHTT''': Rail Head Treatment Train
*:A train which operates across [[Network Rail]] lines in the autumn, spraying water and sandite onto rails to remove crushed leaf debris, and to improve rail head conditions. See also RAT
*'''RM''': Restricted Manual
*'''RM''': Restricted Manual
*:A mode of operation used in certain failure situations on [[London Underground]] lines using Automatic Train Operation (ATO), where the Train Operator drives the train manually under authority from the signaller at a reduced speed.
*'''ROC''' ([[Network Rail]]): Rail Operating Centre
*'''ROC''' ([[Network Rail]]): Rail Operating Centre
*'''ROC''' ([[SimSig:Sessions]]): [[SimSig:Railway Operating Centre|Railway Operating Centre]]  
*'''ROC''' ([[SimSig:Sessions]]): [[SimSig:Railway Operations Centre|Railway Operations Centre]]
*'''ROG''': [[Rail Operations Group]]
*'''ROGS''': The Railways and Other Guided Transport Systems (Safety) Regulations 2006 (as amended)
*'''RR''': Relay Room
*'''RR''': Run(s) as Required
*'''RSF''': Right Side Failure
*'''RSF''': Right Side Failure
*'''RSSB''': Rail Safety and Standards Board
*'''RSSB''': Rail Safety and Standards Board
*'''RTT''': Real Time Trains
*'''RSI''': Route Secure Indicator
*'''RVAR''': Rail Vehicle Accessibility Regulation
*:A form of route proving to permit movement during degraded modes of operation on London Underground
*'''RTT''': [[Real Time Trains]]
*'''RTDI''': Ready To Depart Indicator
*:A white beacon located on the platforms of [[London Underground]] [[Jubilee line|Jubilee]] and [[Northern line]]s that is used to aid in train dispatch.
*:White bodyside indicator lights (BILs) on [[S stock]] trains on the London Underground]]'s [[Circle line|Circle]], [[District line|District]], [[Hammersmith & City line|Hammersmith & City]] and [[Metropolitan line]]s which are used to aid in train dispatch.
*'''RVAR''': Rail Vehicle Accessibility Regulations


== S ==
== S ==
*'''SATS''': Staff Assisted Train Services
[[File:Hugh Llewellyn 19630631832.jpg|right|thumb|A [[ScotRail]] [[class 320]].]]
[[File:C69 Stock train at Moorgate 02.jpg|right|thumb|[[Moorgate]] station on [[London Underground|London Underground’s]] Sub-Surface Railway]]
*'''SATS''': Station Assistant (Train Services)
*'''SCAT''': Speed Control After Tripping
*'''SCAT''': Speed Control After Tripping
*'''SCC''': Service Control Centre
*'''SCC''': Service Control Centre
*'''SCD''': Short Circuiting Device
*'''SCL1''': Service Controller Level 1
*'''SCL1''': Service Controller Level 1
*'''SCL2''': Service Controller Level 2
*'''SCL2''': Service Controller Level 2
*'''ScR''': ScotRail
*'''ScR''': [[ScotRail]]
*'''SE''': Southeastern
*'''SD''': Set Down
*'''SDC''': Service Delivery Centre
*'''SDO''': Selective Door Opening
*:A system where on-train staff select a number of doors, or carriages, to open instead of opening all doors in locations where there is a short platform. See also [[#A|ASDO]] and [[#U|UDS]]
*'''SE''': [[Southeastern]]
*'''SI''': Section Isolator
*: A break in the overhead wires, where two sections of wire are isolated from each other allowing current to either section to be isolated for maintenance. Also called a Section Insulator.
*'''SLL''': South London Line
*'''SMA (0.5-14)''': Signal Migration Area
*'''SMA (0.5-14)''': Signal Migration Area
*'''SN''': Southern Rail
*: Compartmentalised sections of [[London Underground]]'s [[Four Lines Modernisation]] programme. See also [[#0-9|4LM]] and [[#S|SSR]]
*'''SMD''': Stratford Market Depot
*'''SMS''': Safety Management System
*'''SN''': [[Southern Rail]]
*'''SoT''': Start of Traffic
*'''SoT''': Start of Traffic
*'''SotD''': [[Signal of the Day]]
*'''SotD''': [[Signal of the Day]]
Line 186: Line 295:
*'''SPAS''': Signal Passed At Stop
*'''SPAS''': Signal Passed At Stop
*'''SPT''': Signal Post Telephone
*'''SPT''': Signal Post Telephone
*'''SR''': ScotRail
*'''SR''': [[ScotRail]]
*'''SRA''': Strategic Rail Authority
*'''SRAWS''': Signal Repeating Automatic Warning System
*'''SSI''': Solid State Interlocking
*'''SSM''': Shift Signaller Manager
*'''SSO''': Special Stop Order
*'''SSO''': Special Stop Order
*:An order issued to on-train staff to stop at a station where the train is not otherwise booked to stop at. See also [[#N|NTCO]]
*'''SSR''': Sub-Surface Railway
*'''SSR''': Sub-Surface Railway
*:The [[Circle line|Circle]], [[District line|District]], [[Hammersmith & City line|Hammersmith & City]] and [[Metropolitan line]]s of [[London Underground]]
*'''STANME''': Station Number Names
*'''STANME''': Station Number Names
*'''STANOX''': Station Numbers
*'''STANOX''': Station Numbers
*'''Step Back''': A procedure used on some [[London Underground]] lines at terminus stations where after a train arrives at the terminus a new Train Operator boards the rear of the train for departure, the original Train Operator then "steps back" onto the next train. This procedure is used to allow trains to terminate more frequently while allowing Train Operators enough time to change ends.
*'''STI''': Single track infringement
*'''STN''': Special Train Notice
*'''STN''': Special Train Notice
*'''Stock and Crew''':
*:A type of reform common on [[London Underground]] where two drivers swap trains, taking the train number, destination and passengers with them. It is often used to ensure that trains requiring maintenance attention get back to the correct depots at the end of the day.
*'''STP''': Short Term Plan
*'''STP''': Short Term Plan
*'''SWML''': South West Main Line
*'''SWML''': [[South West Main Line]]
*'''SWR''': South Western Railway
*'''SWR''': [[South Western Railway]]
*'''SWT''': South West Trains
*'''SWT''': [[South West Trains]]
 
== T ==
== T ==
*'''T/Op''': Train Operator
[[File:700155 Trainbow south of Balcombe.jpg|right|thumb|Thameslink's [[Trainbow]] [[700155]].]]
[[File:London Underground 1938 Stock at Amersham 9.jpg|right|thumb|[[London Underground]]'s [[1938 stock]] at [[Amersham]] on a rail tour.]]
*'''TAC''': Track Access Controller
*'''TAS''': Traction Auxilliary Set
*'''TAT''': Traction Auxilliary Trip
*'''TBC''': Traction Brake Controller
*'''TBC''': Traction Brake Controller
*'''TBTC''': Transmission Based Train Control
*'''TBTC''': Transmission Based Train Control
*:Name given to the [[SelTrac]] installation used on [[London Underground|London Underground’s]] [[Jubilee line|Jubilee]] and [[Northern line|Northern]] lines. See also [[#C|CBTC]] and [[#D|DTG-R]]
*'''TC''': Track Circuit
*'''TC''': Track Circuit
*:Part of the signalling system, where a simple electronic device is used to help detect the presence of a train. See also TCF and TSF.
*'''TCB''': Track Circuit Block
*'''TCD''': Traffic Controllers Diagrams
*'''TCF''': Track Circuit Failure
*'''TCF''': Track Circuit Failure
*:The failure of a track circuit used in signalling, giving the signaller an indication that a track circuit is occupied when there is no train present. See also TSF
*'''TCP''': Trip Cock Protection
*'''TCP''': Trip Cock Protection
*'''TD''' ([[London Underground]]): Train Description
*'''TD''' ([[London Underground]]): Train Description
*'''TD''': Train Describer  
*'''TD''' ([[Network Rail]]): Train Describer  
*'''TfGM''': [[Transport for Greater Manchester]]
*'''TfGM''': [[Transport for Greater Manchester]]
*'''TfL''': [[Transport for London]]
*'''TfL''': [[Transport for London]]
*'''TfW''': [[Transport for Wales]]
*'''TfW''': [[Transport for Wales]]
*'''TIPLOC''': Timing Point Location
*'''TIPLOC''': Timing Point Location
*'''TL''': Thameslink
*'''TL''': [[Thameslink]]
*'''TMS''': Train Management System
*'''TMS''': Train Management System
*:Onboard computer on trains which monitors the status of various systems and may manage the onboard information system.
*'''TMS''': Tram Management System
*#Onboard computer on trams which monitors the status of various systems and may manage the onboard information system.
*#Signalling system used on the [[Manchester Metrolink]].
*'''TMS''': [[Tramway Museum Society]]
*'''TO''': Technical Officer
*'''TOC''': Train Operating Company
*'''TOC''': Train Operating Company
*'''TOD''': Train Operator's Display
*:In cab display on [[1995 stock|1995]] & [[1996 stock|1996 tube stock]] trains used to display train speed and signalling information to the Train Operator
*'''T/Op''': Train Operator
*'''TOPS''': Total Operations Processing System
*'''TOPS''': Total Operations Processing System
*'''TPE''': TransPennine Express
*'''TPE''': [[TransPennine Express]]
*'''TPS''': Train Planniong System
*'''TPH''': Trains Per Hour
*'''TPI''': Trailing Points Indicator
*'''TPS''': Train Planning System
*'''TPWS''': Train Protection and Warning System
*'''TPWS''': Train Protection and Warning System
*'''Tracks down''': Slang for Track Circuit Failure
*'''TRC''': Track Recording Car
*'''TRC''': Track Recording Car
*'''TRT''': Track Recording Train
*'''TRT''': Track Recording Train
Line 225: Line 364:
*'''TSC''': Transport Strategy Centre
*'''TSC''': Transport Strategy Centre
*'''TSF''': Track Section Failure
*'''TSF''': Track Section Failure
*:The failure of a track circuit, or axle counter, used in signalling to give the signaller an indication of where a train is located. See also TCF
*'''TSI''': Technical Specifications for Interoperability
*'''TSI''': Technical Specifications for Interoperability
*'''TSR''': Temporary Speed Restriction
*'''TSR''': Temporary Speed Restriction
*'''TSW''': Train Sim World
*'''TSW''': Train Sim World
*'''TTN''': Timetable Notice
*'''TTN''': Timetable Notice
*'''TYT''': Track Your Train
*'''TYT''': [[Track Your Train]][https://www.realtimetrains.co.uk/about/trackyourtrain/]
 
== U ==
== U ==
*'''UDS''': Unit Deselect
*:A form of Selective Door Operation (SDO) where the doors are disabled on a per-unit basis. See also [[#A|ASDO]] and [[#S|SDO]]
*'''UERL''': Underground Electric Railway Company of London
*'''UERL''': Underground Electric Railway Company of London
*'''UTC''': Urban Traffic Control
*:A system that interfaces with tramway signalling to ensure balanced traffic flow and tram priority
*'''UTO''': Unattended Train Operation
*'''UTO''': Unattended Train Operation
*:A form of train operation where trains operate automatically without any members of staff onboard
*'''UTU''': Ultrasonic Test Unit
*'''UWC''': User Worked Crossing
== V ==
== V ==
*'''VAR''': Varied Timetable
*'''VAR''': Varied Timetable
*'''VETC''': Virgin Trains East Coast
*'''VCC''': Vehicle Control Centre
*'''VOBC''': Vehichle OnBoard Computer
*'''VIS''': Vehicle Identification System
*:Signalling system used on tramways, using loops resting on sleepers or underneath roads and receivers below trams to enable the signalling system to operate. Similar to VRS
*'''VOBC''': Vehicle On Board Computer
*'''VRS''': Vehicle Recognition System
*'''VSTP''': Very Short Term Plan
*'''VSTP''': Very Short Term Plan
*'''VT''': Virgin Trains
*'''VT''': [[Virgin Trains]]
*'''VTEC''': [[Virgin Trains East Coast]]
== W ==
== W ==
*'''WAML''': West Anglia Main Line
*'''WAML''': [[West Anglia Main Line]]
*'''WCML''': West Coast Main Line
*'''WCML''': [[West Coast Main Line]]
*'''WCRC''': West Coast Railway Company
*'''WCRC''': [[West Coast Railways|West Coast Railway Company]]
*'''WDM''': Wrong Direction Move
*'''WDM''': Wrong Direction Move
*'''WMR''': West Midlands Railway
*'''WLL''': West London Line
*'''WMT''': West Midland Trains
*'''WMR''': [[West Midlands Railway]]
*'''WMT''': [[West Midland Trains]]
*'''Wide to Gauge''': A variation of trap points set neither in the normal nor reverse position for overrun mitigation
*'''WSF''': Wrong Side Failure
*'''WSF''': Wrong Side Failure
*'''WSL''': Wrong Signal Lowered
*'''WSL''': Wrong Signal Lowered
*'''WSLA''': Wrong Signal Lowered and Accepted
*'''WTT''': Working Timetable
*'''WTT''': Working Timetable
== X ==
== X ==
*'''XC''': Cross Country
*'''XC''': [[Cross Country]]
*'''XR''': Crossrail
*'''XR''': [[Crossrail]]
== Y ==
== Y ==
*'''Yellow Peril:''' Colloquial name for a staff circular briefing which details significant changes to signalling arrangements, such as the commissioning of a new signal cabin or modern automatic train control system
== Z ==
== Z ==

Latest revision as of 23:02, 14 March 2024

Not everyone knows all the hundreds of rail-specific acronyms and initialisms, so if any pop up in conversation on the Discord server add them and their meaning below so others can look them up.

Please keep these in alphabetical order so that it is easy to find a specific term.


0-9

  • 4LM: Four Lines Modernisation programme
  • 4 Foot The space between the two running rails on a section of track
  • 6 Foot The area between a pair of running lines
  • 10 Foot The area between two pairs of running lines

A

  • AB: Absolute Block
  • ABCL: Automatic Barrier Crossing, Locally Monitored
  • ABDO: Automatic Braking and Door Opening
  • ACOA: Adverse Change Of Aspect
  • ACWN: Altered Carriage Working Notice
  • AHB: Automatic Half-Barrier Crossing
  • AHBC: Automatic Half-Barrier Crossing
  • ANP: Auto Not Permitted
    An operating state on London Underground lines using Automatic Train Operations (ATO), where trains have been prevented from operating in ATO mode and must instead operate in CM or PM, generally initiated due to staff on or around the track area.
  • AOCL: Automatic Open Crossing, Locally Monitored
  • ARL: Arriva Rail London
  • ARS: Automatic Route Setting
  • ASC: Area Signalling Centre
  • ASDO: Automatic Selective Door Opening. See also SDO and UDS
  • ATC: Automatic Train Control
  • ATO: Automatic Train Operation
  • ATOC: Association of Train Operating Companies
  • ATP: Automatic Train Protection
  • ATS: Automatic Tram Stop
  • ATW: Arriva Trains Wales
  • AWC: Avanti West Coast
  • AWS: Automatic Warning System

B

The British Rail 'Arrows of Indecision'.

C

Hammersmith station, which is the terminus of the Circle and Hammersmith & City Lines
  • C+H: Circle and Hammersmith & City lines
  • CAPE: Cancelled At Point of Entry
  • CAWS: Continuous Automatic Warning System
  • CBTC: Communications Based Train Control
    Name given to the SelTrac installation being installed on London Underground’s SSR as part of the Four Lines Modernisation (4LM) project to enable Automatic Train Operation. See also TBTC and DTG-R
  • CD: Close Doors (indication)
  • CDL: Central Door Locking
  • CDP: Continuous Development Programme
  • Cess: The area along either side of a railway line which is kept at a lower level than the sleeper bottom, in order to provide drainage. May also be considered as a place of safety.
  • CIS: Customer Information System
  • CLR: Central London Railway
  • CM: Coded Manual
    A mode of operation used on London Underground’s Central and Victoria lines where the Train Operator drives the train manually at up to normal line speed using signalling information provided on an in-cab display. See also PM
  • CMS: Competency Management System
  • Corridor of Doom: A liminal space of substantial length inspired by those located at King's Cross St. Pancras and Green Park stations on the London Underground
  • (C)COS: (Crossrail) Central Operation Section
    The Elizabeth line between Abbey Wood and Paddington via Central London. Sometimes incorrectly referred to as the Crossrail Core.
  • CoT: Close of Traffic
  • CR: Chiltern Railways
  • CRS: Computer Reservation System
  • CS: Caledonian Sleeper
  • CSA: Customer Service Assistant
  • CSDE: Correct Side Door Enable
  • CSL2: Customer Service Level 2
  • CSLR: City & South London Railway
  • CSR: Cab Secure Radio
  • CTBC: Combined Traction Brake Controller, See also TBC
  • CTRL: Channel Tunnel Rail Link
  • CWN: Carriage Working Notice

D

Tower Gateway station of the Docklands Light Railway in East London.
  • DCO: Driver Controlled Operation
    A system of operation on the National Rail network where a train operates with both a driver and at least one other member of staff onboard, but where the driver is responsible for operation of the trains doors as well as driving the train.
  • DCV: Doors Closed Visual
  • DDA: Disability Discrimination Act
  • DISI: Defective in Service Instructions
  • DLR: Docklands Light Railway
  • DOO: Driver Only Operation
    A system of operation on the National Rail Network where the only member of operational staff onboard a train is the driver who is responsible for all aspects of the trains operation. Analogous to OPO on London Underground
  • DRA: Driver Reminder Appliance
  • DRM: Duty Reliability Manager (London Underground equivalent of Mobile Operations Manager [MOM].)
  • DRS: Direct Rail Services
  • DSD: Driver's Safety Device
  • DTG-R: Distance to Go Radio
    Automatic Train Operation system in use on London Underground’s Victoria line. See also CBTC and TBTC
  • DVA: Digital Voice Announcer

E

F

A Greater Anglia class 745 FLIRT intercity train.
  • FGW: First Great Western
  • FLIRT: Fast Light Intercity and Regional Train
  • FOC: Freight Operating Company
  • FPI: Facing Points Indicator
  • FPL: Facing Point Lock
  • FRL: Fixed Red Light

G

H

File:Hull Trains Class 802.jpg
A Hull Trains class 802 at St. Pancras

I

Liverpool Street Interlocking Machine Room on the London Underground.
  • IBJ: Insulated Block Joint (aka IRJ)
  • IC: Intercity
  • IECC: Integrated Electronic Control Centre
  • IEP: Intercity Express Programme
  • IET: Intercity Express Train
  • IMR: Interlocking Machine Room
  • IoW: Isle of Wight
  • IRJ: Insulated Rail Joint (aka IBJ)

J

Platform Edge Doors at Canada Water station on the Jubilee Line Extension.
  • Jish: Also known as Josh.
  • Jishlish: Jishlish is the language and myriad of mistakes spoken and typed by Jish.
  • JLE: Jubilee Line Extension
    The section of the Jubilee line between Green Park and Stratford, opened in 1999.

K

  • KVB: Contrôle de Vitesse par Balises
    Translated from French to English as Speed Control by Beacons. A speed control system used on the French national rail network, Channel Tunnel and High Speed 1.
  • KYT: Know Your Train[1]

L

M

Metropolitan Railway electric locomotive Sarah Siddons.

N

The Network Rail New Measurement Train, formed of High Speed Train rolling stock.
  • NCT: Non-Communicating Train
  • NIRM: Network Incident Response Manager
  • NLC: National Location Codes
  • NLE: Northern Line Extension
  • NLL: North London Line
  • NMT: New Measurement Train
  • NR: Network Rail
  • NR: Northern Rail
  • NRM: National Railway Museum
  • NRN: National Radio Network
  • NSE: Network South East
  • NTCO: Not To Call Order
  • NUCKLE: NUneaton, Coventry, Kenilworth and LEamington Spa
    A package of improvement works to the rail corridor between Nuneaton, Coventry, Kenilworth and Leamington Spa, including new stations, signalling, track and other associated improvements.

O

  • OA: Open Access
  • OCS: Overhead Contact System
  • OHLE: Overhead Line Equipment
  • OLE: Overhead Line Equipment
  • ONA: Operator Not Available
  • OOL: On Our Lines (this project)
  • OPO: One Person Operation
    The term used by London Underground to describe the running of trains where the only member of operation staff required is a T/Op. Analogous to Driver Only Operation (DOO) on National Rail
  • OR: Operational Restriction
    A limitation placed on the CBTC system
  • ORR: Office of Rail and Road

P

A British Rail 'PEP' unit.
  • PDL: Portsmouth Direct Line
  • PEA: Passenger Emergency Alarm
  • PED: Platform Edge Doors
  • PEP: Prototype Electro Pneumatic Train. Often used to refer to the classes based on the prototypes; classes 313, 314, 315, 507 & 508.
  • PIOT: Passenger Ill on Train
  • PIS: Passenger Information System
  • PLPR (1-4): Plain Line Pattern Recognition
  • PM: Protected Manual
    A mode of operation used on London Underground’s Jubilee and Northern lines and parts of the Circle, District, Hammersmith & City and Metropolitan lines where Automatic Train Operation is provided. In this mode the Train Operator drives the train manually at up to normal line speed using signalling information provided on an in-cab display. See also CM
  • PoSA: Proceed-on-Sight Authority
  • PPE: Personal Protective Equipment
  • PPI: Points Position Indicator
  • PRI: Preliminary Route Indicator
  • PRM: Persons with Reduced Mobility
  • PSA: Passenger Service Agent
  • PSB: Power Signal Box
  • PSD: Platform Screen Doors
    Full height doors along the edge of the platform, synchronised to the train doors, that improve safety and can help manage tunnel ventilation
  • PSR: Permanent Speed Restriction
  • PTI: Platform Train Interface
  • PTS: Personal Track Safety
  • PU: Pick Up
    A term used to refer to a member of train crew's next train working

Q

  • Q Code train: A train that runs as required

R

  • RA: Right Away (Indication)
  • RAIB Rail Accident Investigation Branch
  • RAT: Rail Adhesion Train
    A number of trains which operate on some London Underground lines during the autumn, spraying sandite onto rails to improve rail head conditions. See also RHTT
  • RCC: Rear Cab Clear (plunger)
  • RDG: Rail Delivery Group
  • REC: Railway Emergency Call
  • RGI: Rail Gap Indicator
  • RHTT: Rail Head Treatment Train
    A train which operates across Network Rail lines in the autumn, spraying water and sandite onto rails to remove crushed leaf debris, and to improve rail head conditions. See also RAT
  • RM: Restricted Manual
    A mode of operation used in certain failure situations on London Underground lines using Automatic Train Operation (ATO), where the Train Operator drives the train manually under authority from the signaller at a reduced speed.
  • ROC (Network Rail): Rail Operating Centre
  • ROC (SimSig:Sessions): Railway Operations Centre
  • ROG: Rail Operations Group
  • ROGS: The Railways and Other Guided Transport Systems (Safety) Regulations 2006 (as amended)
  • RR: Relay Room
  • RR: Run(s) as Required
  • RSF: Right Side Failure
  • RSSB: Rail Safety and Standards Board
  • RSI: Route Secure Indicator
    A form of route proving to permit movement during degraded modes of operation on London Underground
  • RTT: Real Time Trains
  • RTDI: Ready To Depart Indicator
    A white beacon located on the platforms of London Underground Jubilee and Northern lines that is used to aid in train dispatch.
    White bodyside indicator lights (BILs) on S stock trains on the London Underground]]'s Circle, District, Hammersmith & City and Metropolitan lines which are used to aid in train dispatch.
  • RVAR: Rail Vehicle Accessibility Regulations

S

A ScotRail class 320.
Moorgate station on London Underground’s Sub-Surface Railway
  • SATS: Station Assistant (Train Services)
  • SCAT: Speed Control After Tripping
  • SCC: Service Control Centre
  • SCD: Short Circuiting Device
  • SCL1: Service Controller Level 1
  • SCL2: Service Controller Level 2
  • ScR: ScotRail
  • SD: Set Down
  • SDC: Service Delivery Centre
  • SDO: Selective Door Opening
    A system where on-train staff select a number of doors, or carriages, to open instead of opening all doors in locations where there is a short platform. See also ASDO and UDS
  • SE: Southeastern
  • SI: Section Isolator
    A break in the overhead wires, where two sections of wire are isolated from each other allowing current to either section to be isolated for maintenance. Also called a Section Insulator.
  • SLL: South London Line
  • SMA (0.5-14): Signal Migration Area
    Compartmentalised sections of London Underground's Four Lines Modernisation programme. See also 4LM and SSR
  • SMD: Stratford Market Depot
  • SMS: Safety Management System
  • SN: Southern Rail
  • SoT: Start of Traffic
  • SotD: Signal of the Day
  • SPAD: Signal Passed At Danger
  • SPAR: Signal Passed At Red
  • SPAS: Signal Passed At Stop
  • SPT: Signal Post Telephone
  • SR: ScotRail
  • SRA: Strategic Rail Authority
  • SRAWS: Signal Repeating Automatic Warning System
  • SSI: Solid State Interlocking
  • SSM: Shift Signaller Manager
  • SSO: Special Stop Order
    An order issued to on-train staff to stop at a station where the train is not otherwise booked to stop at. See also NTCO
  • SSR: Sub-Surface Railway
    The Circle, District, Hammersmith & City and Metropolitan lines of London Underground
  • STANME: Station Number Names
  • STANOX: Station Numbers
  • Step Back: A procedure used on some London Underground lines at terminus stations where after a train arrives at the terminus a new Train Operator boards the rear of the train for departure, the original Train Operator then "steps back" onto the next train. This procedure is used to allow trains to terminate more frequently while allowing Train Operators enough time to change ends.
  • STI: Single track infringement
  • STN: Special Train Notice
  • Stock and Crew:
    A type of reform common on London Underground where two drivers swap trains, taking the train number, destination and passengers with them. It is often used to ensure that trains requiring maintenance attention get back to the correct depots at the end of the day.
  • STP: Short Term Plan
  • SWML: South West Main Line
  • SWR: South Western Railway
  • SWT: South West Trains

T

Thameslink's Trainbow 700155.
London Underground's 1938 stock at Amersham on a rail tour.
  • TAC: Track Access Controller
  • TAS: Traction Auxilliary Set
  • TAT: Traction Auxilliary Trip
  • TBC: Traction Brake Controller
  • TBTC: Transmission Based Train Control
    Name given to the SelTrac installation used on London Underground’s Jubilee and Northern lines. See also CBTC and DTG-R
  • TC: Track Circuit
    Part of the signalling system, where a simple electronic device is used to help detect the presence of a train. See also TCF and TSF.
  • TCB: Track Circuit Block
  • TCD: Traffic Controllers Diagrams
  • TCF: Track Circuit Failure
    The failure of a track circuit used in signalling, giving the signaller an indication that a track circuit is occupied when there is no train present. See also TSF
  • TCP: Trip Cock Protection
  • TD (London Underground): Train Description
  • TD (Network Rail): Train Describer
  • TfGM: Transport for Greater Manchester
  • TfL: Transport for London
  • TfW: Transport for Wales
  • TIPLOC: Timing Point Location
  • TL: Thameslink
  • TMS: Train Management System
    Onboard computer on trains which monitors the status of various systems and may manage the onboard information system.
  • TMS: Tram Management System
    1. Onboard computer on trams which monitors the status of various systems and may manage the onboard information system.
    2. Signalling system used on the Manchester Metrolink.
  • TMS: Tramway Museum Society
  • TO: Technical Officer
  • TOC: Train Operating Company
  • TOD: Train Operator's Display
    In cab display on 1995 & 1996 tube stock trains used to display train speed and signalling information to the Train Operator
  • T/Op: Train Operator
  • TOPS: Total Operations Processing System
  • TPE: TransPennine Express
  • TPH: Trains Per Hour
  • TPI: Trailing Points Indicator
  • TPS: Train Planning System
  • TPWS: Train Protection and Warning System
  • Tracks down: Slang for Track Circuit Failure
  • TRC: Track Recording Car
  • TRT: Track Recording Train
  • TRTS: Train Ready To Start
  • TRU: Track Recording Unit
  • TRV: Track Recording Vehicle
  • TS: Tube Stock
  • TSC: Transport Strategy Centre
  • TSF: Track Section Failure
    The failure of a track circuit, or axle counter, used in signalling to give the signaller an indication of where a train is located. See also TCF
  • TSI: Technical Specifications for Interoperability
  • TSR: Temporary Speed Restriction
  • TSW: Train Sim World
  • TTN: Timetable Notice
  • TYT: Track Your Train[2]

U

  • UDS: Unit Deselect
    A form of Selective Door Operation (SDO) where the doors are disabled on a per-unit basis. See also ASDO and SDO
  • UERL: Underground Electric Railway Company of London
  • UTC: Urban Traffic Control
    A system that interfaces with tramway signalling to ensure balanced traffic flow and tram priority
  • UTO: Unattended Train Operation
    A form of train operation where trains operate automatically without any members of staff onboard
  • UTU: Ultrasonic Test Unit
  • UWC: User Worked Crossing

V

  • VAR: Varied Timetable
  • VCC: Vehicle Control Centre
  • VIS: Vehicle Identification System
    Signalling system used on tramways, using loops resting on sleepers or underneath roads and receivers below trams to enable the signalling system to operate. Similar to VRS
  • VOBC: Vehicle On Board Computer
  • VRS: Vehicle Recognition System
  • VSTP: Very Short Term Plan
  • VT: Virgin Trains
  • VTEC: Virgin Trains East Coast

W

X

Y

  • Yellow Peril: Colloquial name for a staff circular briefing which details significant changes to signalling arrangements, such as the commissioning of a new signal cabin or modern automatic train control system

Z