SimSig:Sessions/Archive/2

From Bradshaw, the companion guide to On Our Lines
Revision as of 18:54, 13 February 2021 by Jarley (talk | contribs) (+infbox fields)
SimSig Sessions
On Our Lines plays SimSig
2 - East Coast Mainline
Date13 February 2021
Start time1900
Host(s)CallMeFlick (talk) host
TC60054 (talk) host
Simulation Information
Simulations in useKing's Cross, Peterborough and Royston
Sim date15 April 2010
Sim time0800
Service alertsAll routes - code none

On Our Lines' second SimSig Session is taking place on Saturday 13 February 2021. The Session will consist of a chain between King's Cross, Peterborough and Royston power signal boxes. All are free simulations. There are panels to suit all abilities available, and newcomers are welcome. The Session will be available to join from around 1845 for a 1900 start. You can join @#on-our-simsig-lobby at any time for the pre-session chat. We will have a halftime break at 2200, and anticipate finishing the session at around 0100; please let us know if you need to leave before then.

To sign up please edit the page and in the Participants section at the bottom enter your user name, your availability, experience level and which paid simulations you have, if any; if you have a preferred panel you can also list it here although this cannot be guaranteed.

Overview

Good morning East Coast signallers, this is your update from Network Rail regional control at 0800 hours. We currently have no reported incidents across the area and all routes are running with a good service.

All areas

Incident Level

Code unknown
Code unknown

Service status unknown.

[viewpurgeupdate]


Good service on all routes.

There is no information of note.


King's Cross

A good service is operating on all routes. There is a platform alteration at King's Cross, with platform one blocked by a four-car unit until 0915, vice platform 7.

6E52 has been diverted via Welwyn, vice Hertford loop, due to the driver not having the appropriate route knowledge. Signallers are requested to regulate this train as appropriate to ensure it does not leave the King's Cross area significantly early.

Royston

A good service is operating on all routes.

Peterborough

Incident Level

Code unknown
Code unknown

Localised service hold.

[viewpurgeupdate]


Localised late running to southbound First Capital Connect services due to congestion earlier.

There has been some localised late running of first southbound services due to congestion in the Peterborough area. Late running 1P54 is to be looped at Sandy to allow 1A05 to pass.

Panel allocations

Power Signal Box Controller on duty Panel Signaller on duty
King's Cross (K) TC60054 (talk) host Cross Jack (talk)
Finsbury Lcawte (talk)
Palace MichaelDono (talk)
Welwyn Goldenarrow (talk)
Hitchin TheTramwayGay648 (talk)
Peterborough (P) CallMeFlick (talk) host Hitchin-Tempsford Until 2100 Mrdannyp (talk)
From 2100 MinionJosh (talk)
Little Barford-Stilton
Peterborough Mike1901 (talk)
New England
Helpston-Stoke Until 2300 livioisok (talk)
Royston (R) Royston Jarley (talk)

Participants